Auto · NSE: SEDEMAC
SEDEMAC Mechatronics
Q2 FY27 earnings and concall highlights
Q2 FY27 earnings call · Guided by management
Call held 3 Nov 2026 · Read the filing on NSEFiling
- M.Cap
- ₹13,759Cr
- P/E
- —×
- 1Y return
- —
- From 52W high
- −14.7%
Highlights are read by AI from the company's filing and can contain mistakes. Check the source page linked to each line.
Share price
Results Q2 FY27, as filed · standalone · ₹ Cr
| Q2 FY27 | Year ago | YoY | Q1 FY27 | QoQ | |
|---|---|---|---|---|---|
| Revenue | 401 | — | — | 310 | +29.3% |
| EBITDA | 76 | — | — | 59 | +27.7% |
| EBITDA margin | 18.9% | — | — | 19.1% | -24 bps |
| PBTProfit before tax | 51 | — | — | 41 | +22.2% |
| Net profit | 39 | — | — | 33 | +17.6% |
| EPS (₹) | 8.81 | — | — | 7.49 | +17.6% |
From the company's own results filing on NSE. Net profit is the owners' share. Growth and the dotted lines are worked out from the filed figures.
Guidance
EBITDA expected to hold in H2 compared with H1 FY27
Don Devprakash · Head · p. 6
EBITDA expected to hold in H2 compared with H1 FY27
“So overall, we expect our EBITDA to hold for H2 as compared to H1FY27.”
More figures from the call
“And over the next couple of quarters, if we fully populate it and maintain the same revenue that we are now, then we will be at about 65 to 70 percent utilization.”
“We had mentioned at the start of the year that we are expecting the introduction of our ISG on 3 top 10 motorcycle models, and two of them have already happened and are also fully ramped up.”
In short
- 01Q2 and H1 FY27 revenue were the highest ever, with growth of over 40% in both.
- 02EBITDA margin dipped on raw material cost increases; management expects EBITDA to hold in H2 versus H1 FY27.
- 03Further cost pressure is expected from PCB prices; price increases are under negotiation with customers.
- 04MF3 plant has started pilot production; production is expected to substantially shift there by the end of FY27.
- 05H2 FY27 capex is expected to be lower than H1 as MF3 nears completion; an MF5 plant in Tamil Nadu is planned.
- 06Working capital guidance of 13 to 15% of revenue is restated; growth was funded by internal accruals and debt.
- 07New programmes: a European OEM ISG and magneto kit win (SOP H1 FY28), CV products and a power tool controller due to enter production.
Capex
MF3 transition to full production over the next few quarters
Don Devprakash · Head · p. 5
MF3 transition to full production over the next few quarters
“It is not yet, transitioned to having a full production, which will happen over the next few quarters.”
Land bought in Shoolagiri, Tamil Nadu for MF5 plant, to come up in one or two years
Don Devprakash · Head · p. 5
Land bought in Shoolagiri, Tamil Nadu for MF5 plant, to come up in one or two years
“And then we also have bought land in Shoolagiri, Tamil Nadu, and a plant will come up there over the maybe next one or two years, and we are calling that MF5. It will be a substantially bigger plant even compared to MF3.”
H2 capex to be lower than H1 as MF3 capex comes down; no exact number given
Don Devprakash · Head · Q&A · p. 11
H2 capex to be lower than H1 as MF3 capex comes down; no exact number given
“Yeah, so we won't give the exact number, but what we can say is that it will be, at least for the H2, it will be lower than what it has been for H1, primarily because our MF3, the Capex for the MF3, you know, has will come down.”
H1 capex increase mainly MF3, with some work on MF5; not Shoolagiri land cost
Don Devprakash · Head · Q&A · p. 14
H1 capex increase mainly MF3, with some work on MF5; not Shoolagiri land cost
“It's not the Shoolagiri land acquisition cost, but, you know, some work on the MF5 plant, what will be the MF5 plant as well, but mainly MF3.”
Production expected to substantially shift to MF3 by end of FY27; not a hard timeline
Don Devprakash · Head · Q&A · p. 14
Production expected to substantially shift to MF3 by end of FY27; not a hard timeline
“We expect by the end of this financial year, you know, substantially our production, we expect to have shifted to MF3, but again, we'll be flexible. It's not a hard timeline.”
Capacity
New plants mainly meant to free up space at highly utilised MF1
Don Devprakash · Head · Q&A · p. 8
New plants mainly meant to free up space at highly utilised MF1
“And the primary motivation for building new plants is to free up some space and the chaos that comes with very high utilization.”
Order book
Mobility: Business win for ISG ECU and magneto kit from a European 2/3-wheeler OEM; SOP likely H1 FY28
Don Devprakash · Head · p. 4
Mobility: Business win for ISG ECU and magneto kit from a European 2/3-wheeler OEM; SOP likely H1 FY28
“We have also had a business win for the ISG ECU and the Electric Motor, that is the Magneto Kit from a European 2/3-wheeler OEM. And the start of production is likely to happen in H1 of FY28.”
Segments
Mobility: ISG ECU for export ICE three-wheelers has fully ramped up
Don Devprakash · Head · p. 4
Mobility: ISG ECU for export ICE three-wheelers has fully ramped up
“On the mobility side, our ISG ECU for export ICE 3 wheelers have fully ramped up.”
Mobility: Electric two-wheeler MCU launched in FY26 has fully ramped up
Don Devprakash · Head · p. 4
Mobility: Electric two-wheeler MCU launched in FY26 has fully ramped up
“Our electric two-wheeler MCU, which was also launched in FY26, has also fully ramped up.”
Mobility: More than 1 million ISG+EFI ECUs shipped within 2 years of introduction
Don Devprakash · Head · p. 4
Mobility: More than 1 million ISG+EFI ECUs shipped within 2 years of introduction
“Within 2 years of the first introduction, we have shipped more than 1 million in quantity.”
Mobility: One of these motorcycle models expected to shift to ISG+EFI in FY28
Don Devprakash · Head · p. 4
Mobility: One of these motorcycle models expected to shift to ISG+EFI in FY28
“And one of these two models is expected to shift to ISG+EFI in the coming financial year, FY28.”
Commercial vehicles: CV after-treatment controller, EFI ECUs and MCUs to enter production in coming few quarters
Don Devprakash · Head · p. 4
Commercial vehicles: CV after-treatment controller, EFI ECUs and MCUs to enter production in coming few quarters
“So, our after-treatment controller, EFI ECUs and MCUs should get into production in the coming few quarters.”
Demand
Industrial: Industrial EFI ECU demand fell; signs of recovery in H1, recovery expected
Don Devprakash · Head · p. 4
Industrial: Industrial EFI ECU demand fell; signs of recovery in H1, recovery expected
“So, because of this, there has been a reduced demand for EFI ECUs. But for H1 we have already started seeing signs of some demand recovery. So going ahead, we expect this to recover.”
2-wheelers: About 9.5 to 10 million vehicles adopted ISG in last 12 months, mainly company and Honda
Don Devprakash · Head · Q&A · p. 9
2-wheelers: About 9.5 to 10 million vehicles adopted ISG in last 12 months, mainly company and Honda
“Currently, somewhere around 9 and a half to 10 million vehicles have already adopted in the last 12 months. Both from us and from Honda primarily.”
Mobility: OEM hesitation on ISG+EFI mainly about existing EFI supplier ties and dependence
Don Devprakash · Head · Q&A · p. 10
Mobility: OEM hesitation on ISG+EFI mainly about existing EFI supplier ties and dependence
“So, it is mainly the thoughts are about, you know, the relationship that you would be having with the existing EFI supplier or, you know, the dependence sort of a consideration.”
Mobility: ISG can be adopted during regular model refreshes every two or three years
Don Devprakash · Head · Q&A · p. 11
Mobility: ISG can be adopted during regular model refreshes every two or three years
“but it can very well be done as a part of the regular refreshes that happen every maybe two or three years, especially with our sensor less control technology”
China tried in the past and is a very difficult direct sell; some indirect sales
Don Devprakash · Head · Q&A · p. 12
China tried in the past and is a very difficult direct sell; some indirect sales
“And on the China side, we have tried it in the past. It's a very difficult sell, in general to sell directly.”
Margins and costs
EBITDA percentage dipped, mainly due to raw material cost increase
Don Devprakash · Head · p. 3
EBITDA percentage dipped, mainly due to raw material cost increase
“In terms of percentage, EBITDA, there has been a bit of a dip. And the main reason for this is the raw material cost increase.”
Operating leverage from revenue growth offset part of raw material cost increase
Don Devprakash · Head · p. 3
Operating leverage from revenue growth offset part of raw material cost increase
“In fact, because of the strong revenue growth, we have had operating leverage kick in, which has offset some part of the raw material increase.”
More cost pressure expected from PCB cost increase
Don Devprakash · Head · p. 6
More cost pressure expected from PCB cost increase
“Going ahead, we expect even more pressure also to come on account of cost increase on PCBs.”
EBITDA pressure from RM cost increase flagged in May has transpired
Don Devprakash · Head · p. 6
EBITDA pressure from RM cost increase flagged in May has transpired
“We had mentioned that this year we are likely to face some EBITDA pressure on account of RM cost increase. And that is what has transpired.”
No raw material pass-through; price increases being negotiated with customers
Don Devprakash · Head · Q&A · p. 7
No raw material pass-through; price increases being negotiated with customers
“So, in the current environment, there is an ongoing negotiation on increase in prices.”
Debt and working capital
Working capital rose from 135 to 258, mainly due to revenue increase
Don Devprakash · Head · p. 5
Working capital rose from 135 to 258, mainly due to revenue increase
“There is also a steep increase seen in working capital, 135 to 258. This is mainly because of the steep increase in revenue”
Capex and working capital funded through internal accruals and debt, no equity needed
Don Devprakash · Head · p. 5
Capex and working capital funded through internal accruals and debt, no equity needed
“And you can also see that we are comfortably able to fund Capex and working capital increase through internal accruals and debt without having to need equity”
Working capital rises mainly with revenue; situation not expected to change much
Don Devprakash · Head · Q&A · p. 7
Working capital rises mainly with revenue; situation not expected to change much
“There is some pressure, but working capital increases primarily because of revenue increase.”
Working capital situation not seen substantially changing
Don Devprakash · Head · Q&A · p. 7
Working capital situation not seen substantially changing
“so that is, we don't see this situation substantially changing.”
About Rs 240-250 crore invested in H1 across capex and working capital
Don Devprakash · Head · Q&A · p. 15
About Rs 240-250 crore invested in H1 across capex and working capital
“Out of the 333 to 450, so that is about 117 plus another 135 to 258. Okay, so that is another 123. So about 240, 250 crores.”
One-offs
Company moved to new tax regime this financial year, causing PAT unevenness
Don Devprakash · Head · p. 4
Company moved to new tax regime this financial year, causing PAT unevenness
“financial year we have moved to the new tax regime, compared to the old tax regime that we had in the previous financial year.”
Risks
New launches and ramp-ups improved customer concentration metric
Don Devprakash · Head · p. 5
New launches and ramp-ups improved customer concentration metric
“Because of the new launches that have happened in this year and the ramp up of the launches that had happened earlier, this has had a positive impact on the customer concentration metric.”
Further reduction in customer concentration expected as new markets are entered
Don Devprakash · Head · p. 6
Further reduction in customer concentration expected as new markets are entered
“So, as we enter different markets, there will be further, you know, further reduction of this customer concentration risk.”
Risk of R&D not yielding future propositions cannot be fundamentally addressed
Don Devprakash · Head · p. 6
Risk of R&D not yielding future propositions cannot be fundamentally addressed
“This is a risk that is faced by all innovative companies in the world, and there is nothing fundamentally that can be done.”
Company not dependent on a single chip supplier
Don Devprakash · Head · Q&A · p. 12
Company not dependent on a single chip supplier
“Are we dependent on single chip? The answer is a big no.”
Commercial vehicles: Main CV challenge is a business dominated by global tier ones
Don Devprakash · Head · Q&A · p. 13
Commercial vehicles: Main CV challenge is a business dominated by global tier ones
“The main challenge again is going to be that the business today is dominated by the global tier ones, big global tier ones”
Other
Control intensive ECUs sold reached 4.6 million on a TTM basis, up 44% year-on-year
Don Devprakash · Head · p. 3
Control intensive ECUs sold reached 4.6 million on a TTM basis, up 44% year-on-year
“This 4.6 million number, is 44% growth on a year-on-year basis.”
Q2 and H1 were highest ever, with over 40% revenue growth in both
Don Devprakash · Head · p. 3
Q2 and H1 were highest ever, with over 40% revenue growth in both
“Both Q2 and H1 have been the highest ever for us. In both cases, 40% plus revenue growth is seen.”
TTM revenue: about 38% three-year CAGR and about 48% year-on-year growth
Don Devprakash · Head · p. 4
TTM revenue: about 38% three-year CAGR and about 48% year-on-year growth
“Our three-year strong revenue growth CAGR, has continued, so about 38% three-year CAGR and about 48% year on year.”
ROCE dipped due to investment in manufacturing infrastructure
Don Devprakash · Head · p. 4
ROCE dipped due to investment in manufacturing infrastructure
“On the ROCE, there is a bit of a dip, and it is mainly happening because we are investing aggressively for the last few quarters on increasing our manufacturing infrastructure.”
H1 revenue growth and prospects better than expected at start of year
Don Devprakash · Head · p. 6
H1 revenue growth and prospects better than expected at start of year
“So overall on revenue growth, as well as revenue growth prospects, H1 has in fact been better than what we had imagined at the start of the year.”
Sources
- Earnings call transcript, Q2 FY27 Filed 11 Nov 2026 · 21 pages
Management's own statements, quoted from its NSE filings. This page was read by AI and can contain mistakes: check the source pages before relying on any figure. No forecast or opinion of ours. Not investment advice.

