evenfolio

Capital Goods · NSE: QPOWER

Quality Power Electrical Equipments

Q2 FY27 earnings and concall highlights

Price as of 16 Nov 2026
1,525.90+3.02%

Q2 FY27 earnings call · Guided by management

Call held 2 Nov 2026 · Read the filing on NSEFiling

₹200–500​CrOrder intake · Quality Power · next few monthsPandyan · Q&A · p. 9
₹200​CrRevenue · WS Insulators · next yearPandyan · Q&A · p. 13
50​%Growth · next yearPandyan · Q&A · p. 25
₹50–70​CrInsulator capacity capex · WS InsulatorsPandyan · Q&A · p. 7
M.Cap
₹11,817Cr
P/E
78.0×
1Y return
+84.78%
From 52W high
−9.2%

Highlights are read by AI from the company's filing and can contain mistakes. Check the source page linked to each line.

Share price

Results Q2 FY27, as filed · consolidated · ₹ Cr

Q2 FY27Q2 FY26YoYQ1 FY27QoQ
Revenue273206+32.5%233+17.1%
EBITDA6336+73.8%41+53.6%
EBITDA margin23.1%17.6%+549 bps17.6%+548 bps
PBTProfit before tax7744+74.1%59+29.9%
Net profit4224+74.4%36+17.5%
EPS (₹)5.483.14+74.5%4.66+17.6%

From the company's own results filing on NSE. Net profit is the owners' share. Growth and the dotted lines are worked out from the filed figures.

Guidance

Revenue growth · FY2850%Company intends to grow at least around 50% next year
Revenue · WS Insulators · FY28Rs 200 CrWS revenue guided at about Rs 200 crore next year
Margin · long term25%Stable margins guided at about 25%
Order inflow · Quality PowerRs 200-500 CrQuality Power expects Rs 200 to 500 crore order intake in next few months
CapexRs 50-70 CrRs 50 to 70 crore to expand WS porcelain and composite insulator capacity
Capex2.50 USD millionNew Endoks PCS factory cost about $2.5 million

FY27 guidance unchanged; guidance normally revised at end of Q3

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 9
“The guidance is still not changed at this moment. We normally change guidances in end of Q3.”

More figures from the call

Quality Power coil products · Capacity
1,050​kVReactor voltage rating
“voltage reactors up to 1,050 kV and enables us to address larger and more technically demanding customer requirements.”
Bharanidharan Pandyan · Joint Managing Directorp. 4
Mehru · Capacity
₹500​CrCurrent factory revenue capacity · next 3 to 6 months
“The current capacity at this moment would be over by about INR500 crores in the current factory. I think in the next 3 to 6 months, you will hear us with a large capex plan for Mehru.”
Bharanidharan Pandyan · Joint Managing Director · Q&Ap. 11
WS Insulators · Capacity
₹500​CrRevenue capacity after new capex
“For WS, the current capacity is good enough to about INR300 crores. With the new capex coming in, I believe we should be doing about slightly north of INR500 crores.”
Bharanidharan Pandyan · Joint Managing Director · Q&Ap. 11
Endoks · Capacity
4​GWPCS factory capacity
“Endoks PCS factory, the capability is about 4 GW. That is what the planned capacity increases, of which 1 GW is what we've got the orders.”
Bharanidharan Pandyan · Joint Managing Director · Q&Ap. 11
Endoks · Capacity
₹1,500–2,000​CrPCS BESS revenue potential
“I believe it can go about INR1,500 crores to INR2,000 crores, the kind of for the PCS BESS business.”
Bharanidharan Pandyan · Joint Managing Director · Q&Ap. 11
Mehru · Capacity
18​monthsRented capacity period · about 18 months
“And what we say, so with that, with a rented capacity, we may move in for another about 18 months, but we will go in for a new factory that will actually double the current capacity.”
Bharanidharan Pandyan · Joint Managing Director · Q&Ap. 11

In short

  1. 01Management aims to grow at least about 50% in FY28 and calls stable margins about 25%.
  2. 02Q2 revenue was Rs 285.45 crore and PAT Rs 63.33 crore, up 80.10% year on year.
  3. 03The consolidated order book crossed Rs 2,000 crore, excluding Winwin Specialty Insulators.
  4. 04The QIP is targeted for 15 to 30 November; about Rs 300 crore of Rs 700 crore is for working capital.
  5. 05The new Sangli coil factory and the Turkey PCS factory have started production; 60 customer audits take about 6 months.
  6. 06WS Insulators revenue is guided at about Rs 200 crore next year, with insulator orders booked at 20% to 25% EBIT.
  7. 07FY27 guidance is unchanged; management may revise it at the end of Q3, which may be a tough quarter at Quality Power.
  8. 08A large capex plan for Mehru is expected in 3 to 6 months; a new factory would double capacity.

Capex

About 40 acres free in Vizag and about 40 acres in Turkey

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 26
“on a large piece of landholdings now in Vizag, where we have about 40 acres free. And in Turkey also, we have about 40 acres, so land is not a big worry at this moment.”

US: Money set aside for a US office and possible Class B manufacturing in the US

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 7
“We are also using a significant amount of money to set up, what we say, initially an office in the U.S., but also looking out to start a Class B level manufacturing in the U.S. for some of our product categories.”

US: Continued investment in US manufacturing and sales capacity for air-core and oil-filled reactors

Bharanidharan Pandyan · Joint Managing Director · p. 4
“Third, continuing investments in Quality Power capacities, especially for manufacturing and sales capacities in the US, including the infrastructure required to support both air-core and oil-filled reactor business.”

Capacity

Endoks: With more PCS and less battery, PCS BESS could give about Rs 1,500 crore

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 11
“But what we say depends on how we don't want to intend to sell the battery, but with the PCS coming in more, we would be able to do about INR1,500 crores for give and take.”

Quality Power coil products: Sangli global coil factory started manufacturing on 20 October

Bharanidharan Pandyan · Joint Managing Director · p. 3
“At Sangli, our global coil factory commenced manufacturing operations on 20th of October.”

Endoks: New PCS factory for BESS at Nigde, Turkey has started manufacturing

Bharanidharan Pandyan · Joint Managing Director · p. 4
“In Turkey, our new PCS factory for BESS applications at Nigde has also commenced manufacturing operations.”

CTC cables: CTC wire line in trial; about 4 to 5 months to qualify, update in Q4

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 14
“We will need to qualify it with customers. We are giving ourselves about 4, 5 months on that project. Maybe Q4 this year is when you will hear us talk about it.”

Sangli and Turkey have capacity for 2-3 years; Delhi and Pune capex to come

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 25
“So, for the next 2, 3 years, I think Sangli and Turkey have enough capacities. Delhi does not have capacity. Pune does not have capacity. So, those capexes will come in.”

Order book

Win-Win Specialty Insulators: Win-Win won orders for 800 kV HVDC, 765 kV and 400 kV AC insulators

Bharanidharan Pandyan · Joint Managing Director · p. 4
“At the same time, Win-Win has also secured orders for 800 kV HVDC porcelain insulators and also 765 kV AC and 400 kV AC applications from all the large Indian utilities and equipment manufacturers, including Power Grid.”

Consolidated order book crossed Rs 2,000 crore, excluding Winwin

Bharanidharan Pandyan · Joint Managing Director · p. 5
“Coming to the demand environment and our order book, our consolidated order book for the first time crossed INR2,000 crores, excluding the order book of Winwin Specialty Insulators.”

Quality Power: Quality Power order book about Rs 600 crore; last year revenue about Rs 220 crore

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 9
“Quality Power, last year we did about INR220 crores, give and take, revenue. Our current order book is about INR600 crores.”

Mehru: Mehru order book over Rs 600 crore; last year revenue about Rs 315 crore

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 9
“Mehru, I believe, are already at about INR600 crores plus. They did about INR315 crores give and take last year.”

Endoks: More PCS bookings expected in Q4 this year or Q1 next year

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 9
“Once we have some kind of stabilization at the factory, I think we can book more of the PCS, but that would happen somewhere Q4 this year or Q1 next year for them.”

Segments

Endoks: PCS factory billing may start this quarter, subject to milestones and acceptance

Bharanidharan Pandyan · Joint Managing Director · p. 4
“Billing may commence during the current quarter, subject to completion of contractual milestones and customer acceptance requirements.”

Quality Power: Q3 may be tough at Quality Power due to factory transition

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 9
“So, I think Q3 would be kind of a tough time at Quality Power, but I still wouldn't see numbers going down much.”

Endoks: Endoks could see a very large revenue year from the PCS factory

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 9
“Endoks, we could see a blockbuster year from revenue from the PCS factory.”

Sukrut JV: Sukrut JV grew almost 40% in H1 and is profitable

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 20
“I think they have grown H1 was, I think, almost 40% growth over last year. They have been profitable.”

Post FY28, coil, insulator and PCS divisions could keep growing; Mehru cannot

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 25
“Say the coil division would still have capacity to go in. The insulator division capex would be over. I think they could do it. I think the PCS division can do it, but I think Mehru cannot do it.”

Demand

After GE-Trench deal, sourcing from Quality Power may rise over 2-3 years

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 8
“I believe the sourcing volume from Quality Power can go up drastically over the next 2, 3 years, primarily because nobody would like to buy from the competition if option is given.”

Mehru: Instrument transformer demand in India seen at least two to three times more

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 11
“We have already manufactured the shed, but the demand in India is so high that we are looking at a factory in India itself at this moment because we see the demand being at least another two to three times.”

WS Insulators: WS to push its US advantage over next two quarters for higher-margin US orders

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 13
“So, we are trying to push that advantage over the next two quarters. We will translate it into orders in the American market at much higher margins, unlike other peers who white-label the insulators.”

Insulators: Insulator demand seen lasting at least five to seven years

5–7​years
Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 15
“I believe that demand can sustain for at least five to seven years.”

Insulators: Transmission insulator demand about four times supply; 765 kV delivery 18 months

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 15
“I believe the current demand-supply is demand may be about four, supply may be about one. And no capacity is coming up, which means that today if you buy a switchgear or anything on 765 kV, the delivery is 18 months, not because of switchgear, because of the porcelain.”

Margins and costs

Endoks: Next quarter sales may be high, with low-margin BESS projects billed

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 9
“Next quarter could be high in sales for us because it's Q4 for Endoks, but also a lot of BESS projects are being billed in, which means these are low-margin businesses.”

WS Insulators: Insulator orders booked at 20% to 25% EBIT despite about 8.25% duty

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 15
“At this moment, being in SEZ, when we come into India, we have about 8.25% duty. But in spite of that, I think the orders are being booked between 20% and 25% EBIT.”

WS Insulators: Insulator margin in US could be 40% and higher after 1-1.5 years

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 15
“If we go into the US and successfully integrate in a year or year and a half, I believe our margin should be much higher. It'd be similar or higher than Quality Power, 40% and higher.”

No territorial limits; will sell abroad if India sees pricing pressure

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 20
“So, if there's a pricing pressure in India, we would go to some parts of the world. So, we will sell to the highest-paying customer at that month.”

Endoks: PCS booked at about 10% to 12% margin; battery a pass-through

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 21
“We booked the PCS at about 10% to 12%. The battery was a pass-through.”

Debt and working capital

Own cable use adds about 4 months of extra working capital to projects

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 7
“So that 4 months of extra working capital is going to go through all the projects where we are going to use our own cable.”

Endoks: About Rs 20 crore of inventory in Turkey from PCS chipsets and IGBTs

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 16
“So, because Endoks had to take in the chipsets and IGBT, I think there's about INR20 crores of inventory coming in from Turkey.”

Endoks: Turkey inventory to rise slightly over next few quarters with more PCS orders

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 17
“I think out of the large number comes from Turkey, and I think it will slightly increase over the next few quarters as we take start taking more PCS orders.”

Debt is almost close to zero

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 17
“And in today's scenario, I would rather because where our if you look at our debt is almost close to zero.”

Working capital needed for first 2 years; free cash in about 24 to 36 months

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 22
“So, that is the first 2 years. But if you look at the margins and the growth guidelines, I think it will pay for itself, and this would be a free cash that will be available to us in about 24 to 36 months.”

Fund raising

QIP preparations under way, targeted for November subject to approvals and markets

Bharanidharan Pandyan · Joint Managing Director · p. 4
“We are progressing with preparations for the proposed QIP and are targeting November, subject to regulatory approvals, market conditions, and other applicable requirements.”

QIP targeted for around 15 to 30 November, after preferential issue listing

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 24
“The pref listing is expected sometime this week before we open the QIP, but being a holiday season, I think if all the regulatory approvals come in time and everything is in order, I think around November 15th to 30th is what we are targeting.”

WS Insulators: About Rs 175 crore of Rs 700 crore QIP to repay WS debt and its promoters

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 7
“So, out of the INR700 crores, about INR175 crores is for repaying the debt and the promoters of the company, WS.”

About Rs 300 crore of QIP earmarked for working capital

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 7
“We are also earmarking about INR300 crores for working capital requirements.”

Capital allocation priority one: complete the Winwin Specialty Insulators acquisition

Bharanidharan Pandyan · Joint Managing Director · p. 4
“Our capital allocation priorities are focused on four areas. First, completing the proposed acquisition of Winwin Specialty Insulators.”

Acquisitions and new business

Win-Win Specialty Insulators: Win-Win completed type tests for porcelain insulators up to 400 kV

Bharanidharan Pandyan · Joint Managing Director · p. 4
“The team has successfully completed type tests in accordance with applicable American and European standards for porcelain insulators up to 400 kV within the last 2 months.”

WS Insulators: Integration of WS teams and systems has begun while acquisition is under way

Bharanidharan Pandyan · Joint Managing Director · p. 4
“We are now beginning the process of integrating the teams and aligning customer relationships, technical capabilities, and operational systems.”

Mehru: 765 kV instrument transformers to launch in Q4 this year at Elecrama

Bharanidharan Pandyan · Joint Managing Director · p. 15
“In 765, just to give an idea, in 765, we are launching our instrument transformers in Q4 this year in Elecrama.”

Company now makes capacitor and GIS bushings; GIS deliveries started

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 16
“But I can already say that we are making capacitor bushings now, GIS bushings. GIS, we're already started delivering.”

No acquisition news expected in the next 6 to 9 months

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 20
“But at this moment, we are quite busy. In the next 6 months, 9 months, you wouldn't hear anything from us. At least we hope not.”

One-offs

Other expenses fell as Ind AS 29 hyperinflation impact was lower this quarter

Rajesh Jayaraman · Chief Financial Officer · Q&A · p. 10
“Now, the applicable in Ind AS 29 was the working was less in this quarter. So, our expense come down.”

Hyperinflation: about Rs 8 crore debit in Q1, about Rs 4 crore profit in Q2

Rajesh Jayaraman · Chief Financial Officer · Q&A · p. 13
“The hyperinflation for this first quarter was around INR8 crores debited to P&L. And in the second quarter, it was a profit of around INR4 crores.”

Standalone: Q1 standalone margin not sustainable due to Q4 shipment and vendor drawbacks

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 24
“Chirag, this was already indicated in my first quarter earnings call, that that margin was not sustainable, because this had some shipment of Q4 last year coming in, plus some drawbacks that we got from our vendors.”

Earlier quarters had factory repair costs in other expenses

Rajesh Jayaraman · Chief Financial Officer · Q&A · p. 10
“Secondly, in the last quarter, or maybe in the last previous quarter also, we had repairs and other things coming into the factory, considering into that factor.”

Risks

Global supply chain for specialised electrical equipment remains constrained

Bharanidharan Pandyan · Joint Managing Director · p. 5
“However, demand must be viewed alongside the realities of execution. The global supply chain for specialized electrical equipment remains constrained.”

WS Insulators: WS factory, earlier hit by LPG shortage, to get cheaper gas via GAIL pipeline

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 13
“The factory earlier had fallen into trouble because of want of LPG gases. Now, we've got a new PNG pipeline coming in. Next Monday, we will get a cheaper gas coming in, flowing in through GAIL pipelines.”

Turkey forex fully hedged; India uses plain vanilla options with active tracking

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 17
“So, we have a active tracking on -- in Turkey, everything is hedged. Nothing is left unhedged. In India, we have an active tracking. We normally do a plain vanilla option.”

Quality Power coil products: Capacity constraints already arising from FACTS and HVDC orders

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 18
“But also we have capacity constraints coming in already, because we have multiple FACTS orders that we are seeing coming in, some HVDC orders.”

Endoks: No domestic BESS sales; Indian regulations not conducive

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 21
“The regulations in India are not conducive for us to get into India. There are too much of contingent liabilities to be able to sell the BESS in India, where the guarantees and warranties goes for more than a decade.”

Other

Quality Power coil products: Sangli winding started on three machines; customer audits start end of November

Bharanidharan Pandyan · Joint Managing Director · p. 3
“We have commenced winding operations on three machines, completed the first round of ISO audit and are preparing for final customer audits scheduled to start from the end of November.”

Q2 revenue Rs 285.45 crore; PAT Rs 63.33 crore, up 80.10% year on year

Rajesh Jayaraman · Chief Financial Officer · p. 6
“For the quarter, our consolidated revenue from operations stood at INR285.45 crores, while profit after tax reached INR63.33 crore, representing a year-on-year growth of 80.10%.”

Sangli: Productivity-linked incentive schemes being examined at Sangli

Sanjog Mhatre · Chief Executive Officer · p. 6
“We are also examining revised productivity-linked incentive schemes that align employee earnings with measurable improvements in output, quality, and efficiency.”

Quality Power coil products: Revenue to shift to the new coil factory over the next 4 to 5 months

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 11
“So, over the next 4, 5 months, you will slowly see revenues being shifted from A factory to B factory, the new one.”

Endoks: About $2 million spent on PCS R&D in 2020-2025, expensed in P&L

Bharanidharan Pandyan · Joint Managing Director · Q&A · p. 12
“We spend it as a part of P&L in India. So, we spent about $2 million in R&D between 2020 and 2025 developing the PCS converters, putting them into operation, then we qualify for the orders.”

Sources

Management's own statements, quoted from its NSE filings. This page was read by AI and can contain mistakes: check the source pages before relying on any figure. No forecast or opinion of ours. Not investment advice.

Search

Search funds, ETFs, stocks, pages and tools