Share price
Results Q2 FY27, as filed · consolidated · ₹ Cr
| Q2 FY27 | Q2 FY26 | YoY | Q1 FY27 | QoQ | |
|---|---|---|---|---|---|
| Revenue | 5,673 | 3,651 | +55.4% | 7,354 | -22.9% |
| EBITDA | 1,804 | 1,043 | +72.9% | 2,781 | -35.2% |
| EBITDA margin | 31.8% | 28.6% | +322 bps | 37.8% | -603 bps |
| PBTProfit before tax | 1,338 | 756 | +77.0% | 2,373 | -43.6% |
| Net profit | 1,046 | 572 | +82.7% | 1,727 | -39.4% |
| EPS (₹) | 18.38 | 10.33 | +77.9% | 30.38 | -39.5% |
From the company's own results filing on NSE. Net profit is the owners' share. Growth and the dotted lines are worked out from the filed figures.
Guidance
Thriveni: Thriveni sees no challenges in achieving projected EBITDA as costs are passed on
S. K. Naredi · Director Finance · Q&A · p. 8
Thriveni: Thriveni sees no challenges in achieving projected EBITDA as costs are passed on
“And now, we are hopeful that this high cost will be absorbed, and we don't foresee any challenges in achieving the EBITDA what we have projected.”
Beneficiation: Beneficiation benefits expected to start in FY29
Rajesh Gupta · Managing Director · Q&A · p. 11
Beneficiation: Beneficiation benefits expected to start in FY29
“FY29. Volumes of iron ore remains at 26 million tons throughout the period. Relevant or usable iron ore will remain at 26 million. The benefits should start in '29.”
H2 volumes to rise at Lloyds Metals and MDO; copper slower in H2
Rajesh Gupta · Managing Director · Q&A · p. 16
H2 volumes to rise at Lloyds Metals and MDO; copper slower in H2
“Our volumes in Lloyds Metals will go up for sure. Our volumes in the MDO will go up.”
More figures from the call
“So I think 5,850 is the target that we are looking for the full year. So in fact, earlier when we had disclosed in the last quarter, the target was higher at 8,000 tons.”
“And we are expecting that at equipment contracting would help 12 million to 14 million tons of iron ore and around 1.5 million to 1.8 million tons of manganese from next year onwards.”
“On pellets, both our plants of 4 million tons each capacity are running in excess of the rated capacity, and we are debottlenecking towards higher output while adding a third pellet plant as well.”
“At full potential, these operations will produce 74,000 tons of copper and 20,000 tons of cobalt a year.”
“has been approved for opencast and underground operations for 1.5 million tons per annum with a processing capacity of 1.5 million tons per annum.”
“On the steel plant of 3 million tons, our status is right now as follows: number one is that we have got land acquired of around 1,200 acres. Number two, we have an EC, the environment clearance of 4.5 million tons in hand.”
In short
- 01Stand-alone H1 EBITDA margin was 38.33%, up 542 basis points year on year.
- 02FY27 capex expected around Rs 13,000 crore, with a similar figure next year.
- 03Pellet volume expected about 8 million tons this year and about 9.5 million tons next year.
- 04Steel plant and wire rod mill to start in Q1 2027, delayed by about a quarter.
- 05FY27 copper target cut to 5,850 tons from 8,000 tons due to Surya Mines challenges.
- 06Chemaf plants to be completed by end of FY27 and in production in FY28.
- 07Chemaf debt restructuring to close in 3 to 4 months; long-run debt about $500 million.
- 08Beneficiation benefits expected to start in FY29.
Capex
Logistics: Longer, larger pipeline network being built to carry beneficiated material
Rajesh Gupta · Managing Director · p. 4
Logistics: Longer, larger pipeline network being built to carry beneficiated material
“And we are now extending this to a much longer and larger pipeline network, which will carry our beneficiated materials over long distances, eliminating the movement of fine iron ore by truck almost entirely.”
Steel: Steel plant and wire rod mill to start in Q1 2027, delayed by about a quarter
Rajesh Gupta · Managing Director · Q&A · p. 11
Steel: Steel plant and wire rod mill to start in Q1 2027, delayed by about a quarter
“Blast furnace and coke oven should get started in Q4. And steel plant and wire rod mill should get started in Q1 2027. It delayed by a quarter or so, the steel plant particularly, but it's a huge plant.”
Power: Power plant started to supply beneficiation and pellet plants
Rajesh Gupta · Managing Director · Q&A · p. 8
Power: Power plant started to supply beneficiation and pellet plants
“Right now, we are starting -- out of this EC, we're only starting the power plant, which will be used for powering our beneficiation plant as well as the pellet plants.”
Chemaf: Chemaf's two copper-cobalt projects to be completed by end of FY27, production in FY28
Hemankur Upadhyaya · Director · Q&A · p. 9
Chemaf: Chemaf's two copper-cobalt projects to be completed by end of FY27, production in FY28
“We are confident of completing them by the end of this financial year and have them in production in FY28.”
Power: Investing in power to lower costs as government power rates are high
Rajesh Gupta · Managing Director · Q&A · p. 13
Power: Investing in power to lower costs as government power rates are high
“For example, now we are putting money into power because power rates by the government are pretty high, and we are trying to lower our overall costs.”
Capacity
Pellets: Pellet capacity to go from 8 to 9.6 million tons in the next 3 to 4 months
Rajesh Gupta · Managing Director · Q&A · p. 10
Pellets: Pellet capacity to go from 8 to 9.6 million tons in the next 3 to 4 months
“That should get -- it should become from 8 million to 9.6 million tons in the next 3, 4 months.”
Segments
Iron ore: Iron ore production 3.95 million tons in Q2 and 10 million tons in H1
Riyaz Shaikh · Director of Finance & Chief Financial Officer · p. 5
Iron ore: Iron ore production 3.95 million tons in Q2 and 10 million tons in H1
“Iron ore production for quarter 2 was 3.95 million tons, up 15.5% year-on-year with H1 production at 10 million tons, up 35% year-on-year.”
Iron ore: Iron ore monthly run rate above 2 million tons
Riyaz Shaikh · Director of Finance & Chief Financial Officer · p. 5
Iron ore: Iron ore monthly run rate above 2 million tons
“Our monthly run rate remains upward of 2 million tons.”
Pellets: Pellet production 2.11 million tons in Q2, 3.81 million tons in H1 after second plant
Riyaz Shaikh · Director of Finance & Chief Financial Officer · p. 6
Pellets: Pellet production 2.11 million tons in Q2, 3.81 million tons in H1 after second plant
“production was 2.11 million tons in quarter 2 and 3.81 million tons in H1 following the commissioning of our second pellet plant in May.”
Thriveni: Thriveni H1 EBITDA Rs 884 crore, up 85%, margin 19.18%
S. K. Naredi · Director Finance · p. 6
Thriveni: Thriveni H1 EBITDA Rs 884 crore, up 85%, margin 19.18%
“EBITDA for H1 came at INR884 crores, up 85% year-on-year with margins at 19.18%, an expansion of 436 basis points over the last year.”
Thriveni: Thriveni iron ore volumes 11.22 million tons in Q2 and 30.31 million tons in H1
S. K. Naredi · Director Finance · p. 6
Thriveni: Thriveni iron ore volumes 11.22 million tons in Q2 and 30.31 million tons in H1
“Iron ore volumes, including BHQ, stood at 11.22 million tons in Q2 and 30.31 million tons in H1.”
Demand
Sales mix 71% domestic and 29% export
Riyaz Shaikh · Director of Finance & Chief Financial Officer · p. 6
Sales mix 71% domestic and 29% export
“Our sales mix was 71% domestic and 29% export.”
Margins and costs
Iron ore: First slurry pipeline running at full capacity and has lowered iron ore freight cost
Rajesh Gupta · Managing Director · p. 4
Iron ore: First slurry pipeline running at full capacity and has lowered iron ore freight cost
“The first pipeline is already running at full capacity and has actually lowered our freight cost for iron ore.”
H1 EBITDA margin 38.33%, up 542 basis points year on year
Riyaz Shaikh · Director of Finance & Chief Financial Officer · p. 5
H1 EBITDA margin 38.33%, up 542 basis points year on year
“Our H1 EBITDA margin came in at 38.33%, the best half-year margin the company has ever reported and an expansion of 542 basis points year-on-year.”
Q2 EBITDA margin 37.22%, up 419 basis points year on year
Riyaz Shaikh · Director of Finance & Chief Financial Officer · p. 5
Q2 EBITDA margin 37.22%, up 419 basis points year on year
“Our Q2 margin stood at 37.22%, up 419 basis points year-on-year.”
Iron ore: Slurry pipeline commissioning lowered iron ore logistics and freight cost
Riyaz Shaikh · Director of Finance & Chief Financial Officer · p. 5
Iron ore: Slurry pipeline commissioning lowered iron ore logistics and freight cost
“Three factors are driving this: first, the commissioning of the slurry pipeline lowered the logistics and freight cost on iron ore.”
Value-added products: Value-added products 61% of revenue and 67% of EBIT in Q2, vs 43% and 49% a year ago
Riyaz Shaikh · Director of Finance & Chief Financial Officer · p. 5
Value-added products: Value-added products 61% of revenue and 67% of EBIT in Q2, vs 43% and 49% a year ago
“added products now contribute 61% of stand-alone revenue and 67% of EBIT in quarter 2 versus 43% and 49% a year ago.”
Debt and working capital
Stand-alone net debt Rs 9,316 crore as of 30 September 2026
Riyaz Shaikh · Director of Finance & Chief Financial Officer · p. 6
Stand-alone net debt Rs 9,316 crore as of 30 September 2026
“Stand-alone net debt as on 30th September 2026 stood at INR9,316 crores, comfortable relative to the EBITDA the business is now generating, even through an intensive capex cycle.”
Consolidated net debt below Rs 20,000 crore; Chemaf debt being renegotiated
Riyaz Shaikh · Director of Finance & Chief Financial Officer · p. 6
Consolidated net debt below Rs 20,000 crore; Chemaf debt being renegotiated
“Our consolidated net debt remains below INR20,000 crores. A significant part of this pertains to the debt acquired as part of the Chemaf acquisition, which we are actively working to renegotiate on more favourable terms which would bring our group net debt down meaningfully.”
Chemaf: Chemaf debt restructuring to close within 3 to 4 months, before end of FY27
Hemankur Upadhyaya · Director · Q&A · p. 10
Chemaf: Chemaf debt restructuring to close within 3 to 4 months, before end of FY27
“so we are looking to close it within the next 3 to 4 months. So before the end of this financial year, it will be done.”
Chemaf: Chemaf long-run net debt to be about $500 million, from about $800 million now
Hemankur Upadhyaya · Director · Q&A · p. 10
Chemaf: Chemaf long-run net debt to be about $500 million, from about $800 million now
“So net debt in the longer run in the asset will be somewhere around $500 million from the current levels of around $800 million.”
Stand-alone borrowing around Rs 9,500 crore
Riyaz Shaikh · Director of Finance & Chief Financial Officer · Q&A · p. 14
Stand-alone borrowing around Rs 9,500 crore
“the debt what we are doing will be around INR9,500 crores of borrowing what the company has done on a stand-alone basis.”
Fund raising
NCD raise is an enabling resolution; intention is to use funds for capex
Riyaz Shaikh · Director of Finance & Chief Financial Officer · Q&A · p. 14
NCD raise is an enabling resolution; intention is to use funds for capex
“That's an enabling resolution what we have taken. So we just wanted to keep ourselves ready if such an opportunity arises. And we already have this resolution in place, and we can go ahead with it. And everything obviously will be used more and more for capex or that's what the intention is.”
Chemaf: Chemaf capex to be funded by raising from US investors and multilateral institutions
Hemankur Upadhyaya · Director · Q&A · p. 14
Chemaf: Chemaf capex to be funded by raising from US investors and multilateral institutions
“But ultimately, we are looking at raising that from the U.S. parties, some of the very well-known investors as well as some of the multilateral institutions.”
Acquisitions and new business
Copper (Panguna): Panguna partnership gives access to copper asset that peaked at about 175,000 tons a year
Rajesh Gupta · Managing Director · p. 4
Copper (Panguna): Panguna partnership gives access to copper asset that peaked at about 175,000 tons a year
“Looking ahead, our partnership at Panguna gives us access to one of the greatest -- world's greatest untapped copper sources, an asset which at its peak produced around 175,000 tons of copper every year.”
Panguna: PNG (Panguna) project at very early stage
Hemankur Upadhyaya · Director · Q&A · p. 9
Panguna: PNG (Panguna) project at very early stage
“Then coming to PNG, basically, it's very early stage. We feel confident that we have the trust of the people.”
Chemaf: Chemaf fully consolidated; 51% of profit goes to minority interest
Hemankur Upadhyaya · Director · Q&A · p. 10
Chemaf: Chemaf fully consolidated; 51% of profit goes to minority interest
“But yes, 51% of the profitability will be going out as minority interest.”
Panguna: PNG: working with government on operating model and with people on long-term plan
Hemankur Upadhyaya · Director · Q&A · p. 10
Panguna: PNG: working with government on operating model and with people on long-term plan
“So currently, we are focusing upon 2 things only: one is working with the government on what is the right model of operations; and second, working with the people on how we develop a long-term plan for inclusive growth.”
Risks
Copper: Geopolitical headwinds and near-term cost challenges in copper operations
Rajesh Gupta · Managing Director · p. 4
Copper: Geopolitical headwinds and near-term cost challenges in copper operations
“These are -- there are geopolitical headwinds, and we are addressing the near-term cost challenges, but the long-term logic of captive ore and in-house mining through Thriveni's expertise remains compelling.”
Thriveni: Q2 production lower each year due to rainy season
S. K. Naredi · Director Finance · Q&A · p. 8
Thriveni: Q2 production lower each year due to rainy season
“Q2 always being rainy season, it has been historically that Q2 is always low. Q2 is slightly better than Q1, but from Q3 and Q4, we scale up.”
Thriveni coal: Higher diesel and explosives prices from geopolitical issues hurt coal profitability
S. K. Naredi · Director Finance · Q&A · p. 8
Thriveni coal: Higher diesel and explosives prices from geopolitical issues hurt coal profitability
“And in terms of coal also, due to these geopolitical issues for the pricing of HSD and explosives, we had to suffer a little bit.”
Surya Mines: Surya Mines faces sulphuric acid supply problems, lacking its own acid plant
Hemankur Upadhyaya · Director · Q&A · p. 9
Surya Mines: Surya Mines faces sulphuric acid supply problems, lacking its own acid plant
“In terms of production, we have been facing challenges in terms of supply of sulphuric acid because it does not have a dedicated sulphuric acid plant.”
Surya Mines: DRC diesel cost about $3.2 per litre, almost 3x India
Hemankur Upadhyaya · Director · Q&A · p. 9
Surya Mines: DRC diesel cost about $3.2 per litre, almost 3x India
“It is like $3.2 per liter, which is, I mean, almost 3x of what we see in India.”
Other
Stand-alone Q2 revenue Rs 4,132 crore, up 62% year on year
Riyaz Shaikh · Director of Finance & Chief Financial Officer · p. 5
Stand-alone Q2 revenue Rs 4,132 crore, up 62% year on year
“Revenue from operations for Q2 stood at INR4,132 crores, up 62% year-on-year.”
Stand-alone H1 revenue Rs 9,545 crore, 94% growth
Riyaz Shaikh · Director of Finance & Chief Financial Officer · p. 5
Stand-alone H1 revenue Rs 9,545 crore, 94% growth
“For H1, revenue was INR9,545 crores, a sharp 94% growth over last year.”
EBITDA Rs 1,538 crore in Q2 (up 83%) and Rs 3,658 crore in H1 (up 126%)
Riyaz Shaikh · Director of Finance & Chief Financial Officer · p. 5
EBITDA Rs 1,538 crore in Q2 (up 83%) and Rs 3,658 crore in H1 (up 126%)
“EBITDA for quarter 2 came in at INR1,538 crores, up 83% year-on-year, and for H1 at INR3,658 crores, up 126% year-on-year.”
Growth driven by higher iron ore EC limits, faster pellet ramp-up and sponge iron volumes
Riyaz Shaikh · Director of Finance & Chief Financial Officer · p. 5
Growth driven by higher iron ore EC limits, faster pellet ramp-up and sponge iron volumes
“This growth was driven by higher iron ore EC limits, a faster-than-planned ramp-up of the pellet plant and improved sponge iron volumes.”
Thriveni: 88 electric equipment units operating at the mine, 20 more at railway siding
S. K. Naredi · Director Finance · p. 6
Thriveni: 88 electric equipment units operating at the mine, 20 more at railway siding
“We now have 88 electric equipment units operational at the mine and a further 20 are at the railway siding.”