evenfolio

Power · NSE: KPIGREEN

KPI Green Energy

Q2 FY27 earnings highlights, from the results presentation

Price as of 16 Nov 2026
297.95−7.18%

Q2 FY27 · From the investor presentation

Read the filing on NSEFiling

10​GWpIPP capacity target · IPP · FY32Slides · p. 29
269​MWpSolar capacity commissioned · EPCSlides · p. 9
128​MWpSolar capacity commissioned · EPCSlides · p. 9
8.33​GWTotal portfolio capacitySlides · p. 12
M.Cap
₹5,890Cr
P/E
13.4×
1Y return
−36.53%
From 52W high
−42.0%

Highlights are read by AI from the company's filing and can contain mistakes. Check the source page linked to each line.

Share price

Results Q2 FY27, as filed · consolidated · ₹ Cr

Q2 FY27Q2 FY26YoYQ1 FY27QoQ
Revenue727634+14.6%694+4.8%
EBITDA269226+19.2%246+9.5%
EBITDA margin37.0%35.6%+141 bps35.4%+157 bps
PBTProfit before tax131158-17.3%131-0.3%
Net profit92109-15.7%86+7.4%
EPS (₹)4.155.50-24.5%4.32-3.9%

From the company's own results filing on NSE. Net profit is the owners' share. Growth and the dotted lines are worked out from the filed figures. In Q2 FY27 the filing tags the owners' profit as ₹0 Cr against its own period profit; the period profit less minority interest is shown.

Guidance

Capacity · Sun Drops Energia10 GWhSun Drops Energia cell manufacturing and BESS assembly scaling to 10 GWh
Capacity · Sun Drops Energia · FY28-FY315 GWhPhased plan: 5 GWh BESS assembly FY28, 5 GWh cells FY29, 10 + 10 GWh FY31
Capacity · IPP · FY3210 GWpKP Group targets: 10 GWp IPP by KPI Green, 10 GWp third-party EPC, 10 GWh cells

More figures from the presentation

Company · Capacity
1.96​GWCapacity commissioned · single year
“Commissioned 1.96 GW of pipeline while booking 4.18 GW of fresh orders, increasing capacity from 4.15 GW to 8.33 GW in a single year”
Slidesp. 12
IPP · Capacity
3.22​GWIPP portfolio
“3.22 GW Total IPP Portfolio”
Slidesp. 13
IPP · Capacity
1.37​GWIPP capacity under execution
“1.34 GWp Commissioned 0.51 GW Acquisition 1.37 GW Under Execution”
Slidesp. 13
IPP · Capacity
317​MWpCapacity energized
“Energized an additional 317 MWp under the GUVNL 677 MWp hybrid”
Slidesp. 9
IPP · Capacity
511​MWpCapacity energized
“677 MWp GUVNL Hybrid 511 MWp 166 MWp 511 / 677 MWp”
Slidesp. 13
IPP · Capacity
301​MWpCapacity energized
“350 MWp GUVNL Solar 301 MWp 49 MWp 301 / 350 MWp”
Slidesp. 13

In short

  1. 01Q2 FY27 total income rose 16% and EBITDA 22%; PAT fell on higher depreciation and finance costs.
  2. 02Q2 FY27 PAT was Rs 92 crore against Rs 117 crore a year ago, down 21%.
  3. 03Overall portfolio capacity reached about 8.33 GW, up from 4.15 GW in a year.
  4. 04Binding offer to acquire 507.9 MW of operational wind assets for about Rs 2,410 crore.
  5. 05BESS portfolio now 565 MW / 1,130 MWh, fully contracted.
  6. 06Secured an EPC order of about Rs 2,025 crore for a 550 MWp solar project.
  7. 07Quarterly interest cost rose 114% to Rs 92 crore.

Capex

Sun Drops Energia: Sun Drops campus: about 110 acres; 10 GWh BESS + 10 GWh cell; BESS SOP FY28

Slides · p. 18
“~110 acres 10 GWh + 10 GWh FY28”

Sun Drops Energia: Sun Drops plant: design engaged, team hired, equipment order placed

Slides · p. 18
“Design engaged • Team hired • Equipment order placed”

Capacity

IPP: 150 MW GUVNL wind: PPA signed, financial closure achieved

Slides · p. 13
“150 MW GUVNL Wind 150 MW PPA Signed, Financial Closure Achieved”

BESS: 565 MW GUVNL BESS: BESPA executed, financial closure under process

Slides · p. 13
“565 MW GUVNL (2 projects) BESS 565 MW BESPA Executed, Financial Closure Under Process”

IPP: 143 MWp C&I / group captive solar-hybrid IPP work in progress

Slides · p. 13
“143 MWp C&I / Group Captive Solar / Hybrid 143 MWp Work in Progress”

Order book

BESS: Total BESS portfolio at 565 MW / 1,130 MWh, fully contracted

Slides · p. 9
“Total BESS portfolio now at 565 MW / 1,130 MWh, fully contracted”

Solar EPC: Secured about Rs 2,025 crore EPC order for a 550 MWp solar project

Slides · p. 9
“Secured a ~₹2,025 Cr EPC order for a 550 MWp solar project from”

BESS: BESPA executed with GUVNL for a 120 MW / 240 MWh standalone BESS

Slides · p. 9
“Executed a BESPA with GUVNL for a 120 MW / 240 MWh standalone”

Wind IPP: PPA signed with SJVN for 300 MW wind IPP project

Slides · p. 9
“Signed a PPA with SJVN for the 300 MW wind IPP project”

EPC: NTPC REL NOAs worth Rs 621 crore for BoS packages covering 650 MWp

Slides · p. 9
“Received NTPC REL NOAs worth ₹621 Cr for BoS packages covering 650”

Demand

Company says India's clean energy transition is entering a multi-year acceleration phase

Slides · p. 5
“India's clean energy transition is entering a multi-year acceleration phase, backed by record capacity additions”

Margins and costs

Q2 FY27 total income up 16%, EBITDA up 22%; PAT fell on depreciation and finance costs

Slides · p. 23
“Continued Operating Income: Total Income up 16% and EBITDA up 22% YoY; the decline in PAT reflects higher depreciation and finance costs on a growing”

Q2 FY27 interest cost Rs 92 crore vs Rs 43 crore, up 114%

Slides · p. 25
“Interest Cost 92 43 114% 172 81 112% 182”

Q2 FY27 depreciation Rs 60 crore vs Rs 32 crore, up 88%

Slides · p. 25
“Depreciation and Amortization 60 32 88% 111 61 82% 133”

EBITDA margin 38% in Q2 FY27 vs 36% a year ago

Slides · p. 25
“EBITDA (%) 38% 36% - 38% 36% - 37%”

Debt and working capital

Net worth Rs 3,525 crore at H1 FY27 vs Rs 2,871 crore

Slides · p. 26
“Net Worth 3,525 2,871 H1 FY27 Net Worth at”

Fixed assets Rs 6,993 crore at H1 FY27 vs Rs 3,102 crore

Slides · p. 26
“Fixed Assets 6,993 3,102 ₹6,993 Cr as compared to”

H1 FY27 operating cash flow Rs 406 crore vs Rs 270 crore

Slides · p. 27
“Cash Flow from Operating Activities 406 270”

H1 FY27 investing cash outflow Rs 1,482 crore vs Rs 1,172 crore

Slides · p. 27
“Cash Flow from Investing Activities -1,482 -1,172 Operating Activities at”

Cash and equivalents Rs 224 crore at end of H1 FY27 vs Rs 192 crore

Slides · p. 27
“Cash and Cash Equivalents at the end of the period 224 192”

Acquisitions and new business

Wind IPP: Binding offer for AEPL and NWPL at about Rs 2,410 crore, adding 507.9 MW operational wind

Slides · p. 9
“(NWPL) for ~₹2,410 Cr, adding 507.9 MW of operational wind assets”

Wind IPP: 508 MW SECI wind assets of AEPL and NWPL: acquisition under process

Slides · p. 13
“508 MW SECI (AEPL & NWPL) Wind 508 MW Opera tiona l Asset, Acquisition Under Process”

Solar EPC: Acquired solar EPC company DEK and Mavericks Green Energy (DMGEL)

Slides · p. 9
“Acquired DEK and Mavericks Green Energy (DMGEL), solar EPC”

Floating Solar: Floating solar: 142 MW Kadana Dam secured; CERC and GERC trading licenses

Slides · p. 17
“BESPA Executed: 565 MW Secured 142 MW Kadana Dam CERC + GERC trading licenses”

Other

IPP: H1 FY27 generation 31% above FY26 full year; IPP revenue share up from 8% to 15%

Slides · p. 14
“H1FY27 generation already 31% above FY26 full year; IPP share of revenue up from 8% in Q2FY26 to 15% in Q2FY27”

Full earnings contribution from growing asset base expected during the year

Slides · p. 23
“asset base, with full earnings contribution expected to materialise during the year”

Q2 FY27 PAT Rs 92 crore vs Rs 117 crore, down 21%; H1 PAT Rs 187 crore

Slides · p. 25
“Profit After Tax (PAT) 92 117 -21% 187 228 -18% 509”

Q2 FY27 total income Rs 741 crore vs Rs 641 crore, up 16%

Slides · p. 25
“Total Income 741 641 16% 1,451 1,255 16% 2,742”

Q2 FY27 basic EPS Rs 4.17 vs Rs 5.53, down 25%

Slides · p. 25
“Basic EPS (₹) 4.17 5.53 -25% 8.50 10.80 -21% 24.13”