JSW Infrastructure

Price as of 12 Nov 2026
342.05−1.10%

Q2 FY27 earnings call · Guided by management

Call held 27 Oct 2026 · Read the filing on NSEFiling

28​%Logistics EBITDA margin · logistics · FY27J · p. 6
₹5,000–6,000​CrCapex spend · this financial yearJ · Q&A · p. 7
46​million tonnesCargo volume · Jaigarh and Dharamtar · FY27J · Q&A · p. 11
88–90​%Rail business EBITDA margin · logistics rail business · whole financial yearJ · Q&A · p. 11
M.Cap
₹79,698Cr
P/E
55.3×
1Y return
+20.17%
From 52W high
−8.9%

Highlights are read by AI from the company's filing and can contain mistakes. Check the source page linked to each line.

Share price

Results Q2 FY27, as filed · consolidated · ₹ Cr

Q2 FY27Q2 FY26YoYQ1 FY27QoQ
Revenue1,4811,266+17.0%1,445+2.5%
EBITDA674610+10.6%674+0.1%
EBITDA margin45.5%48.2%-263 bps46.6%-110 bps
PBTProfit before tax431463-6.9%463-6.8%
Net profit318361-12.0%347-8.3%
EPS (₹)1.351.72-21.5%1.65-18.2%

From the company's own results filing on NSE. Net profit is the owners' share. Growth and the dotted lines are worked out from the filed figures.

Guidance

EBITDA · FY27Rs 2,950-3,000 CrFY27 EBITDA targeted at about Rs 2,950-3,000 crore
EBITDA · logistics · FY27Rs 400 CrkeptFY27 logistics EBITDA target of Rs 400 crore retained
EBITDA · ports · FY27Rs 2,550-2,560 Crwas 2600 Rs CrFY27 port EBITDA may be about Rs 2,550-2,560 crore instead of Rs 2,600 crore
EBITDA margin · logistics · FY2728%was 24%FY27 logistics EBITDA margin guidance revised to 28% from 24%
EBITDA margin · logistics rail business · FY2788-90%cutLogistics turnover guidance cut; rail business margin seen at 88% to 90%
Volume growth · domestic · H2 FY278-10%Domestic volume growth in H2 expected at 8% to 10% year-on-year
Capex · FY2788%Slurry pipeline about 88% complete; on schedule for commissioning by March 2027
CapexRs 8,250 CrCumulative capex about Rs 8,250 crore to September 2026; Rs 1,500 crore in the quarter
Capex · FY27Rs 5,000-6,000 CrH1 capex Rs 2,100 crore; FY27 spend expected at Rs 5,000-6,000 crore
Capex · FY27-FY28Rs 16,500 CrkeptFY27-FY28 capex guidance of Rs 16,500 crore kept
Capex3-4 monthsKeni delayed on environment clearance; EC expected in another 3 to 4 months
Capex2 yearsCommon rail corridor to Jatadhar to take at least another 2 years
CapexRs 30,000 CrRs 30,000 crore port capex excludes Kolkata Phase 2; Oman Phase 2 and bids are upsides
Capacity · logistics · FY27110 rakesRail rake fleet grew from 42 to 78; target of at least 110 rakes by March 2027
Capacity · logistics · long term267 rakesRake target of about 267 is fluid and expected to be revised upwards

Despite Fujairah, management says it will broadly meet guidance

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · Q&A · p. 11
“And I would like to give you a caveat that despite Fujairah, we are now totally focused on the India operation that even in spite of Fujairah, we'll be able to meet the guidance that we have given you approximately nearing those numbers. So broadly, we stick to that commitment.”

logistics: Rakes added at end of Q2 available for full H2, supporting logistics target

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · Q&A · p. 12
“The additional rakes that we got into the system, so these came to the Q2 end. So these are now available for the entire H2 period.”

More figures from the call

Company · Guidance
₹3,000​CrFY27 EBITDA guidance given in January · FY27
“Koundinya, so while we articulated our FY27 EBITDA guidance of around INR3,000 crores in Jan, the environment was slightly different operating environment, I would say.”
Nagarajan J · Chief Financial Officer · Q&Ap. 13

In short

  1. 01FY27 total EBITDA targeted at about Rs 2,950-3,000 crore; port EBITDA seen at Rs 2,550-2,560 crore instead of Rs 2,600 crore.
  2. 02FY27 logistics EBITDA margin guidance revised to 28% from 24%; logistics EBITDA target of Rs 400 crore retained.
  3. 03Rake fleet at 78, planned to reach at least 110 by March 2027.
  4. 04FY27-FY28 capex guidance of Rs 16,500 crore kept; FY27 spend expected at Rs 5,000-6,000 crore.
  5. 05Port capacity goal of 300 MTPA by FY28 and 400 MTPA by FY30 unchanged.
  6. 06Fujairah terminal contributed no EBITDA; 8 tanks expected to start operations in the first week of November, but local storage demand is down.
  7. 07Domestic volume growth expected at 8% to 10% year-on-year in H2.
  8. 08Slurry pipeline about 88% complete and on schedule for commissioning by March 2027; Jatadhar berth to handle cargo by March 2027.

Capex

Further Rs 6,000 crore of capex committed through orders

Nagarajan J · Chief Financial Officer · p. 6
“In addition, the company has already committed a further INR6,000 crores of capex by placing orders for machinery, long-lead items and other civil work towards”

Committed capex since start of programme nearly Rs 14,250 crore to September 2026

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · p. 7
“So close to -- you can say that our committed expenditure till September '26, right from the start of our capex program, is now nearly close to INR14,250 crores.”

Dharamtar Port and Jaigarh Port: Jaigarh mechanization to finish in Q1 FY28; Dharamtar by Q4 FY27

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · p. 4
“At Dharamtar Port and Jaigarh Port, the berth side works are substantially completed and mechanization works are expected to be completed during Q1 FY28 for Jaigarh, while Dharamtar will be completed by Q4 '27.”

Oman: Oman project: bids due mid-November; work expected to start in Q4 FY27

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · Q&A · p. 8
“So in Oman, we already have floated the tenders for the project, and we are going to receive the bid somewhere in mid-November. And we are also in the process of appointing the PMC for the project along with our MDO partner. And we expect work to start somewhere in Q4 of FY27.”

Murbe: Murbe: land acquisition under way; work expected to start in Q4 FY27

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · Q&A · p. 8
“In Murbe, we are already proceeding with land acquisition and the process of inviting tenders has already been done. And again, here, we expect the work to start somewhere in Q4 of FY27.”

Capacity

logistics: 72 rakes operational since October; 6 more in Nov-Dec; 32 more due over H2

Nagarajan J · Chief Financial Officer · p. 6
“Consequently, 72 rakes have been operational since October, with the remaining 6 expected to be operationalized during November and December, providing further support to volume and earnings growth. A further 32 rakes are expected to be delivered over H2, which would take the total fleet size to 110 by March 2027.”

ports: Port capacity to grow from 186 MTPA to 300 MTPA by FY28 and 400 MTPA by FY30

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · p. 5
“We continue to build a diversified ports and logistics platform with a clear objective of expanding port capacity from the current 186 million tonnes per annum to 300 million tonnes by FY28 and further to 400 million tonnes by FY '30,”

Jatadhar Port: Jatadhar first phase 30 MT; EC received for 52 MT

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · Q&A · p. 9
“So currently, Jatadhar Port has got a waterfront permission for close to 3.5 kilometers, out of which the current development is around 690 meters to handle the 30 million tonnes in the first phase. As you rightly pointed out, we have already got the EC clearance for 52 million tonnes in Jatadhar.”

Jatadhar Port: Jatadhar has scope to go up to 100 or 120 million tonnes

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · Q&A · p. 9
“Another 700 will give you another 30 million or 35 million. It depends on what kind of machinery you are putting into play. So you have an ample scope for taking it up to 100 or 120.”

Jatadhar Port: Jatadhar capacity increases generally take at least 36 months

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · Q&A · p. 9
“So it's a question that as and when the capacities increase, this generally take a time frame of at least 36 months.”

Segments

Fujairah Liquid Terminal: Fujairah: 8 tanks in commissioning; operations expected to start first week of November

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · Q&A · p. 8
“On 29th or so, they will be giving the final permission for commissioning these 8 tanks for operations. So we expect to start operations somewhere in the first week of November.”

Jaigarh and Dharamtar: Jaigarh volumes fell as Dolvi plant sourced via Dharamtar; mix to shift back

Nagarajan J · Chief Financial Officer · Q&A · p. 11
“So it is more of where the Dolvi plant is sourcing from which port. So here, it was from Dharamtar and the Mumbai anchorage combination. So going forward in the next 6 months, the combination will be Jaigarh and Dharamtar.”

Fujairah Liquid Terminal: Fujairah long-term prospects called bullish; near term is wait and watch

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · Q&A · p. 16
“However, this will play out depending on the demand for products at that point of time in November, December. So it's a kind of a very fluid situation. Long-term prospects, extremely bullish, but immediate prospects, we have to wait and watch.”

ports: Historic cargo growth expected at Paradip coal terminal this year

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · Q&A · p. 12
“And we expect a historic cargo growth in Paradip coal terminal this year. So that drives the third-party cargo also.”

captive cargo: Next jump in group cargo expected when Dolvi steel plant expands

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · Q&A · p. 12
“So the next jump that we will see in group cargo will happen when Dolvi steel plant moves into its next phase of expansion.”

Margins and costs

ports: Port EBITDA margin 49.4% vs 53.1%, on no Fujairah volume and coal terminal mix

Nagarajan J · Chief Financial Officer · p. 5
“The EBITDA margin was 49.4% versus 53.1% a year ago, the dip in port EBITDA margin was primarily driven by absence of volume, contribution from Fujairah and incremental volumes”

ports: Terminal EBITDA margins 30% to 35%; Jaigarh pickup in H2 expected to lift port margins

Nagarajan J · Chief Financial Officer · Q&A · p. 8
“In this quarter, if you see, the volume growth has primarily come from terminals, wherein, obviously, the EBITDA margins continue to be in the range of 30% to 35%. A slight dip has happened in Jaigarh volumes. That has also contributed to a drop in the overall EBITDA margin. But in H2, we expect a pickup in Jaigarh, which can enhance the overall port margins.”

logistics: Q2 logistics EBITDA Rs 81 crore vs Rs 25 crore; margin 29% from 15%

Nagarajan J · Chief Financial Officer · p. 6
“Operating EBITDA for the logistics segment stood at INR81 crores, up from INR25 crores, representing a 3.3x increase Y-o-Y. EBITDA margin expanded to 29% from 15%, driven by the growing contribution from rail logistics business.”

rake business: Rake business margin around 90% as haulage charges are netted off

Nagarajan J · Chief Financial Officer · Q&A · p. 7
“The EBITDA margin is around 28% overall, whereas the margins for the rake business stood at around 90%, because in the revenue part, we only take the premium and the rebate. The haulage charges are netted off.”

Q2 depreciation Rs 175 crore vs Rs 149 crore; finance cost Rs 108 crore vs Rs 99 crore

Nagarajan J · Chief Financial Officer · p. 6
“Consolidated depreciation was INR175 crores, and finance cost was INR108 crores in the current quarter, as compared to INR149 crores and INR99 crores, respectively, in the previous quarter ended September '25.”

Debt and working capital

Cash position of Rs 1,693 crore as of September 2026

Nagarajan J · Chief Financial Officer · p. 6
“As of September 2026, we maintained a cash position of INR1,693 crores, underscoring one of the strongest balance sheets in the sector.”

H2 finance cost expected broadly in line with H1 as capex interest is capitalised

Nagarajan J · Chief Financial Officer · Q&A · p. 12
“It will be broadly in line with what is there in H1 because whatever incremental borrowings are ongoing are all towards capex, wherein the interest cost is getting capitalized.”

Outstanding capex creditors of nearly Rs 950 crore

Nagarajan J · Chief Financial Officer · p. 7
“Further, the company has an outstanding capex creditors of nearly INR950 crores.”

H2 interest cost may rise slightly from ROU expense on leased rakes

Nagarajan J · Chief Financial Officer · Q&A · p. 13
“can be a slight increase in the interest cost on account of ROU spend because we have taken some rakes on these finance lease primarily. So there under the accounting entry, ROU expense will be there, which will be sitting in the finance expenses.”

Fund raising

Rs 6,400 crore net QIP proceeds invested in mutual funds and FDs, drawn for capex

Nagarajan J · Chief Financial Officer · Q&A · p. 11
“No, because we have invested the funds which we have raised net of, I mean, INR6,400 crores was something which we realized net of all the charges, and that has been invested in mutual funds and fixed deposits. And as and when the capex spend keeps happening, drawdown will be happening from that fund.”

Acquisitions and new business

containers: 30-year concession signed for 13 MTPA Outer Container Terminal at NSD Dock, Kolkata

1.4​million TEUs
Rinkesh Roy · Joint Managing Director and Chief Executive Officer · p. 4
“In the container cargo segment, we achieved a key milestone by signing the 30-year concession agreement for the 13 million ton per annum Outer Container Terminal project at NSD Dock, Kolkata. Once operational, the project will increase our total container handling capacity in Kolkata to approximately 1.4 million TEUs,”

logistics: Acquired NCR Rail Infrastructure; ICD at Ballari approved; Gati Shakti terminal awarded

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · p. 4
“Beyond ports, we continued to strengthen our logistics platform during the period through the acquisition of NCR Rail Infrastructure Limited, approval for the development of an inland container depot at Kudathini, Ballari and the award of the Gati Shakti Cargo Terminal at Kulipalaiyam, Tamil Nadu.”

Oman: Oman: Rs 40 crore equity subscribed in the quarter, awaiting allotment

Nagarajan J · Chief Financial Officer · p. 9
“Further update on Oman is in this quarter, we have subscribed to the equity capital by infusing INR40 crores waiting allotment.”

Bidding focus on container and liquid terminals at major ports; bulk less aggressively

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · Q&A · p. 15
“We are looking at further bids which are coming up now in the southern part of India for containers as well as for liquids. On the bulk, we are participating, but it would be not very aggressively.”

One-offs

international operations: Fujairah gave virtually no EBITDA; H1 EBITDA loss of about Rs 16 crore from international ops

Nagarajan J · Chief Financial Officer · Q&A · p. 13
“Escalations and all in Middle East, Fujairah Terminal contributed virtually no EBITDA during this period. And in fact, we have reported EBITDA loss of around close to INR16 crores in H1 on account of this international operations, primarily because of the fixed overheads sitting in the P&L.”

Fujairah: Fujairah EBITDA was around Rs 250 crore in FY26

Nagarajan J · Chief Financial Officer · Q&A · p. 15
“It was for the full year, FY26, it was INR250 crores.”

Fujairah: Fujairah EBITDA was Rs 134 crore in H1 FY26

Nagarajan J · Chief Financial Officer · Q&A · p. 15
“H1 of FY26, it is -- EBITDA was at INR134 crores from Fujairah.”

Q2 PBT Rs 431 crore vs Rs 463 crore, on unrealized forex losses and higher depreciation

Nagarajan J · Chief Financial Officer · p. 6
“PBT stood at INR431 crores, compared with INR463 crores in the corresponding period last year. The decline was primarily driven by unrealized forex losses on account of rupee depreciation, an upward shift in yield curve and higher depreciation charges,”

Fujairah: Fujairah: about Rs 16 crore negative from fixed overheads; Rs 4 crore O&M income received

Nagarajan J · Chief Financial Officer · Q&A · p. 14
“So around INR16 crores is a negative contribution on account of -- because of the fixed overheads, which we continue to incur. Only thing is from Dibba Port and Fujairah Port, wherein we do the O&M contract, around INR4 crores of income we have received.”

Risks

Fujairah Liquid Terminal: Demand for storage tanks near Fujairah has come down substantially

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · Q&A · p. 8
“Currently, as I told you earlier also, the demand for storage tanks in that area has come down substantially because of the problem. The ships are not coming there.”

Tuticorin: Tuticorin shutdown of about 30 days planned for berth commissioning

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · Q&A · p. 17
“There would be -- as with one shutdown that we'll be taking in Tuticorin for commissioning the berth there, that would be in a range of 30 days, but we are confident that we'll be keeping this guidance going of growth.”

Fujairah: Fujairah insurance claims still being assessed; priority is to recover capex

Nagarajan J · Chief Financial Officer · Q&A · p. 15
“So our first priority will be to secure the capital expenditure, which we will be incurring to construct or reconstruct this storage stack. So that will be a priority rather than going for a loss of profit.”

Fujairah: Insurers await a state declaration on whether it was a war

Nagarajan J · Chief Financial Officer · Q&A · p. 15
“No. See, claims are still being assessed by the insurance company. One is obviously forensic study and all has been done on that. They are also awaiting for the state to declare whether it is a war or not.”

Paradip Iron Ore Terminal: Paradip iron ore volumes dipped on moisture limit curbs; 8 lakh tonnes stock by September

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · Q&A · p. 16
“So by end of September, we had close to 8 lakh tonnes of stock lying with us. And we had to refuse traffic. So once the weather started drying up and the transportation moisture limits came within the permissible limits, then only shipments started.”

Other

containers: Interim operations started at 6.3 MTPA Kolkata container terminal

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · p. 4
“During the quarter, we also commenced interim operations at the 6.3 million ton per annum Kolkata container terminal, which was awarded in JulY25,”

Higher other income came from interest on QIP proceeds

Nagarajan J · Chief Financial Officer · Q&A · p. 7
“Yes, that's primarily because of the QIP proceeds which came in. It's interest on those QIP proceeds.”

ports: H1 FY27 cargo 60.5 MT; India operations grew 10% vs industry 5%

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · p. 3
“During H1 FY27, we handled 60.5 million tonnes of cargo, including 29.4 million tonnes in Q2, and our India operations grew 10% year-on-year, significantly ahead of industry growth of 5%,”

H1 FY27 revenue Rs 2,926 crore, up 18%; EBITDA Rs 1,348 crore, up 13%

Rinkesh Roy · Joint Managing Director and Chief Executive Officer · p. 4
“Overall, on a consolidated basis, our operating revenue was INR2,926 crores for the first half of FY27, representing 18% year-on-year growth. Operating EBITDA for the period stood at INR1,348 crores, marking a 13% increase, while net profit reached INR686 crores.”

Q2 FY27 revenue Rs 1,481 crore, up 17%; EBITDA Rs 674 crore, up 11%

Nagarajan J · Chief Financial Officer · p. 6
“Total consolidated operating revenue for the company stood at INR1,481 crores and operating EBITDA stood at INR674 crores, reflecting a Y-o-Y growth of 17% and 11%, respectively.”