Construction · NSE: HGINFRA
H.G. Infra Engineering
Q2 FY27 earnings and concall highlights
Q2 FY27 earnings call · Guided by management
Call held 4 Nov 2026 · Read the filing on NSEFiling
- M.Cap
- ₹2,651Cr
- P/E
- 12.4×
- 1Y return
- −54.63%
- From 52W high
- −55.6%
Highlights are read by AI from the company's filing and can contain mistakes. Check the source page linked to each line.
Share price
Results Q2 FY27, as filed · consolidated · ₹ Cr
| Q2 FY27 | Q2 FY26 | YoY | Q1 FY27 | QoQ | |
|---|---|---|---|---|---|
| Revenue | 974 | 905 | +7.6% | 1,101 | -11.5% |
| EBITDA | 250 | 206 | +21.0% | 304 | -17.9% |
| EBITDA margin | 25.6% | 22.8% | +283 bps | 27.6% | -197 bps |
| One-off items | — | — | — | -147 | — |
| PBTProfit before tax | 105 | 72 | +46.4% | -0 | — |
| Net profit | 79 | 52 | +51.6% | -45 | — |
| EPS (₹) | 12.24 | 7.95 | +54.0% | -6.83 | — |
From the company's own results filing on NSE. Net profit is the owners' share. Growth and the dotted lines are worked out from the filed figures.
Guidance
Expects at least INR5,000-6,000 crore of new orders over the next 5 months
Harendra Singh · Chairman and Managing Director · Q&A · p. 9
Expects at least INR5,000-6,000 crore of new orders over the next 5 months
“So if we are seeing that how we are confident that we would be at least looking at INR5,000 crores to INR6,000 crores of new orders to be awarded for the 5 months.”
HAM: About INR200 crore from Karnal and other balance work in the second half
Harendra Singh · Chairman and Managing Director · p. 9
HAM: About INR200 crore from Karnal and other balance work in the second half
“Even in Karnal, small portion is balanced. So there are INR200 crores.”
Q4 revenue stated as some INR3,000 crore or more; wording unclear
Harendra Singh · Chairman and Managing Director · p. 7
Q4 revenue stated as some INR3,000 crore or more; wording unclear
“in any of the scenario would be doing some INR3,000 or INR4,500 crores to INR 3,000 crores in Quarter 4.”
Management says second-half revenue is achievable as mobilisation is done on all projects
Harendra Singh · Chairman and Managing Director · p. 7
Management says second-half revenue is achievable as mobilisation is done on all projects
“we are confidently enough that we would be able to do that part because the mobilization has been done in all such projects.”
More figures from the call
“So these are the three projects of HAM, which again would be contributing around INR600-odd crores in this particular phase of 2 quarters.”
In short
- 01Order inflow targeted at Rs 10,000-11,000 crore in FY27, with about Rs 5,500 crore secured up to Q2.
- 02Revenue expected around Rs 6,000 crore for FY27, with about Rs 4,200 crore in the second half.
- 03EBITDA margin expected at 13% to 14% in Q3, Q4 and after.
- 04Management hopes for about Rs 7,000 crore revenue in FY28.
- 05Standalone gross debt of Rs 1,595 crore targeted to fall to Rs 900 crore by year end, using monetisation proceeds.
- 06Contract assets of about Rs 2,100 crore expected to fall to Rs 1,200-1,500 crore by March.
- 07Management is not confident margins will improve to 15% in the coming one to two years.
Capex
Total equity need INR3,050 crore for HAM, transmission, BESS, solar; INR1,846 crore infused
Harendra Singh · Chairman and Managing Director · p. 5
Total equity need INR3,050 crore for HAM, transmission, BESS, solar; INR1,846 crore infused
“Regarding equity requirements of all projects, the total equity required for all HAM, transmission, BESS and solar is around INR3,050 crores. And as of September 2026, INR1,846 crores has been infused in these projects.”
Solar: Solar project about 96% complete; delays from monsoon, transmission line, land issues
Harendra Singh · Chairman and Managing Director · p. 4
Solar: Solar project about 96% complete; delays from monsoon, transmission line, land issues
“the company's solar project reached approximately 96% completion, while heavy monsoon, transmission line, land acquisition, local disruption has caused execution delays.”
HAM: Karnal Ring Road 99% complete; COD targeted in Q4 2027
Harendra Singh · Chairman and Managing Director · p. 3
HAM: Karnal Ring Road 99% complete; COD targeted in Q4 2027
“the Karnal Ringroad project has achieved 99% completion, and the company has already applied the provisional completion certificate, which is expected to be there anytime, and the COD is targeted in Quarter 4 2027.”
HAM: Tirupati-Chennai HAM 71.8% complete, targeted by 31 March 2027
Harendra Singh · Chairman and Managing Director · p. 3
HAM: Tirupati-Chennai HAM 71.8% complete, targeted by 31 March 2027
“The Tirupati-Chennai HAM project has achieved 71.8% completion and is progressing well with the target to complete by March 31st, 2027.”
Roads: Nelamangala-Tumkur 73.64% complete, likely finished by March 2027
Harendra Singh · Chairman and Managing Director · p. 3
Roads: Nelamangala-Tumkur 73.64% complete, likely finished by March 2027
“The Nelamangala-Tumkur project has achieved 73.64% completion and is progressing towards the timely completion and likely to be finished by March 2027.”
Capacity
BESS: Binding agreements for three BESS projects of around 1,470 MWh
Harendra Singh · Chairman and Managing Director · p. 4
BESS: Binding agreements for three BESS projects of around 1,470 MWh
“the company has already executed a binding agreement with GUVNL and NVVN for three BESS projects. This is around 1,470 megawatt hour.”
Order book
Order book at INR13,685 crore as of September, split across roads, rail, renewables and T&D
Harendra Singh · Chairman and Managing Director · p. 3
Order book at INR13,685 crore as of September, split across roads, rail, renewables and T&D
“As of September 26, the company's order book stood at INR13,685 crores, comprising INR8,792 crores from roads and highways, INR2,883 crores from rails and metro, INR610 crores from renewable projects, including BESS, and INR1,400 crores from transmission and distribution.”
Roads: Pune-Shirur project from Welspun worth INR3,931 crore in mobilisation stage
Harendra Singh · Chairman and Managing Director · p. 3
Roads: Pune-Shirur project from Welspun worth INR3,931 crore in mobilisation stage
“The Pune-Shirur projects awarded by Welspun at a cost of INR3,931 crores is currently in a mobilization stage, with work is expected to pick from quarter three 2027 onwards once we are getting the appointed date, which is likely to be there within a month.”
INR6,000 crore of projects expect appointed date by mid-December at latest
Harendra Singh · Chairman and Managing Director · p. 7
INR6,000 crore of projects expect appointed date by mid-December at latest
“So these are all INR6,000 crores of projects where the appointed date is likely to be there within the month max by mid of December.”
Roads: Appointed date for Pune-Shirur and Capital Region Ring Road expected late Nov or early Dec
Harendra Singh · Chairman and Managing Director · p. 15
Roads: Appointed date for Pune-Shirur and Capital Region Ring Road expected late Nov or early Dec
“November end or first week of December. So both for Pune-Shirur and this project.”
About INR7,000 crore of bids awaiting results, plus about INR5,000 crore in railways
Harendra Singh · Chairman and Managing Director · p. 9
About INR7,000 crore of bids awaiting results, plus about INR5,000 crore in railways
“It is around INR7000-odd crores of project which we already have bidded, and the results are yet awaited. Railway around INR5,000 crores of projects.”
Segments
Roads and highways: Roads expected to keep offering bidding and order inflow opportunities
Harendra Singh · Chairman and Managing Director · p. 2
Roads and highways: Roads expected to keep offering bidding and order inflow opportunities
“We expect this segment to continue offering meaningful bidding and order inflow opportunities.”
Rail and metro: Company strengthening rail and metro presence; looking at pipeline opportunities
Harendra Singh · Chairman and Managing Director · p. 2
Rail and metro: Company strengthening rail and metro presence; looking at pipeline opportunities
“We are strategically strengthening our presence in this segment through our ongoing rail and metro projects and looking into many opportunities as a pipeline.”
Renewables: Management sees long-term opportunities in transmission, distribution and BESS
Harendra Singh · Chairman and Managing Director · p. 3
Renewables: Management sees long-term opportunities in transmission, distribution and BESS
“We see significant long-term opportunities in transmission and distribution as well as BESS, which are expected to play an important role in strengthening the country's power infrastructure.”
Demand
Metro: Ahmedabad Metro has four to five large projects worth about INR7,000 crore
Harendra Singh · Chairman and Managing Director · p. 9
Metro: Ahmedabad Metro has four to five large projects worth about INR7,000 crore
“Ahmedabad Metro is having few big size projects, like INR7,000 crores of projects, four, five projects are there.”
Roads: Around 1,200 km of road expected to be targeted for award this year
Harendra Singh · Chairman and Managing Director · p. 10
Roads: Around 1,200 km of road expected to be targeted for award this year
“there, but we are quite hopeful in this year around 1200- odd km, likely they are just targeting to be awarded.”
Roads: Re-invited MSRDC projects use same qualification criteria company met earlier
Harendra Singh · Chairman and Managing Director · p. 14
Roads: Re-invited MSRDC projects use same qualification criteria company met earlier
“MSRDC project which are invited now, we have the same qualification criteria from three years back when we are qualified for that.”
Roads: MSRDC re-invited cancelled projects; RSRDC to bid two expressways in 4-5 months
Harendra Singh · Chairman and Managing Director · p. 9
Roads: MSRDC re-invited cancelled projects; RSRDC to bid two expressways in 4-5 months
“So looking into state, like MSRDC has already again invited those projects which were canceled, so the invitation is there, and ITO has already been floated. Again, the state government, Rajasthan government is again, RSRDC is going to bid for their two expressways in the next 4 months, 5 months.”
Rail and metro: Rail tenders out for INR1,000-5,000 crore projects, including new lines and metro
Harendra Singh · Chairman and Managing Director · p. 10
Rail and metro: Rail tenders out for INR1,000-5,000 crore projects, including new lines and metro
“For rails, I think some big size projects already the tenders are there. These are the INR1,000 crores-INR5,000 crores of projects for trains and new lines like metro also.”
Margins and costs
BESS: BESS margin now around 12%, down from 20%+ expected, due to currency and battery prices
Harendra Singh · Chairman and Managing Director · p. 10
BESS: BESS margin now around 12%, down from 20%+ expected, due to currency and battery prices
“Now it has been around 12%, which has been now. Earlier, it was supposed to be 20% plus, because of this dollar and this currency, as well as the battery prices.”
Roads: Highway projects protected from commodity costs by price escalation for bitumen and POL
Harendra Singh · Chairman and Managing Director · p. 10
Roads: Highway projects protected from commodity costs by price escalation for bitumen and POL
“As far as highway is concerned, definitely, as we have seen the commodity, but been protected by the real-time price escalation for bitumen and crude POL.”
Rail: Rail projects take a commodity cost hit, described as not a big number
Harendra Singh · Chairman and Managing Director · p. 10
Rail: Rail projects take a commodity cost hit, described as not a big number
“For rail projects, there has been a hit, and we have taken that hit is going to be there, which we have seen that not a big number is going to be there”
Transmission: Aluminium and copper up 30%-40%+ versus transmission bids; escalation built into budget
Harendra Singh · Chairman and Managing Director · p. 10
Transmission: Aluminium and copper up 30%-40%+ versus transmission bids; escalation built into budget
“The transmission with aluminum and copper is playing where the commodity prices have gone a bit 30%-40%+ at the number which we have bidded.”
Not confident margins improve in next one to two years, citing commodity prices and competition
Harendra Singh · Chairman and Managing Director · p. 15
Not confident margins improve in next one to two years, citing commodity prices and competition
“Probably at the current scenario, it does not look like because of the geopolitical commodity prices as well as the competition all across entire infrastructure. We are not very much confident that the coming one to two years is going to be better.”
Debt and working capital
Standalone gross debt at INR1,595 crore
Harendra Singh · Chairman and Managing Director · p. 5
Standalone gross debt at INR1,595 crore
“On a standalone basis, our gross debt stands at INR1,595 crores.”
Debt includes INR714 crore working capital, INR400 crore NCD, INR482 crore term loans
Harendra Singh · Chairman and Managing Director · p. 5
Debt includes INR714 crore working capital, INR400 crore NCD, INR482 crore term loans
“This comprises INR714 crores of working capital debt, INR400 crores of NCD, and INR482 crores of term loans and current maturities”
Standalone debt targeted at INR900 crore by end of this year
Harendra Singh · Chairman and Managing Director · p. 6
Standalone debt targeted at INR900 crore by end of this year
“an expected collection from receivable monetization proceeds, we are targeting to close our standalone debt at INR900 crores by the end of this year.”
Solar: 89% of solar project debt sanctioned; INR215 crore+ due for release in Q3-Q4 FY27
Harendra Singh · Chairman and Managing Director · p. 4
Solar: 89% of solar project debt sanctioned; INR215 crore+ due for release in Q3-Q4 FY27
“Financially, 89% of the required project debt is sanctioned, and remaining INR215 plus crores of balance is slated for release in Quarter 3 and Quarter 4 FY27, following the plant commissioning.”
Contract assets at INR2,100 crore; expected INR1,200-1,500 crore by March end
Harendra Singh · Chairman and Managing Director · p. 12
Contract assets at INR2,100 crore; expected INR1,200-1,500 crore by March end
“This contract asset which has now been increased, significantly it has gone high to INR2,100 crores, would be roughly in the range of about say INR1,500 crores or rather INR1,200 crores-INR1,500 crores by March end.”
Fund raising
Transmission: Financial closure done for Angul transmission; other two targeted next quarter
Harendra Singh · Chairman and Managing Director · p. 5
Transmission: Financial closure done for Angul transmission; other two targeted next quarter
“for Angul, we have received the financial closure, and for other 2 projects, financial closure is targeted to be achieved in the coming quarter.”
BESS: Choraniya BESS has in-principle bank sanction; land and design work in progress
Harendra Singh · Chairman and Managing Director · p. 4
BESS: Choraniya BESS has in-principle bank sanction; land and design work in progress
“For, Choraniya land-related formalities and design activities are progressing, and an in-principle bank sanction has been received.”
Acquisitions and new business
HAM: 51% of OD-5 transferred in Q2 for partial consideration of INR103 crore
Harendra Singh · Chairman and Managing Director · p. 5
HAM: 51% of OD-5 transferred in Q2 for partial consideration of INR103 crore
“So during Quarter 2, company has successfully transferred 51% of its shareholding in OD-5, receiving partial consideration of INR103 crores.”
HAM: INR92.3 crore holdback received in Q2; INR857.46 crore received in total till September
Harendra Singh · Chairman and Managing Director · p. 5
HAM: INR92.3 crore holdback received in Q2; INR857.46 crore received in total till September
“In Quarter 2 FY27, the company has also received an amount of INR92.3 crores against partial release of holdback in all 4 earlier assets. Cumulatively, the company has received a total amount of INR857.46 crores till September 2026.”
HAM: AP-1 equity transfer expected in Q3 FY27 after NHAI and lender NOCs
Harendra Singh · Chairman and Managing Director · p. 5
HAM: AP-1 equity transfer expected in Q3 FY27 after NHAI and lender NOCs
“the company has already received NOC from NHAI and lenders and expects to complete the equity transfer of AP-1 project in Quarter 3 FY27.”
HAM: About INR550 crore of monetisation collections expected in Q3 and Q4
Harendra Singh · Chairman and Managing Director · p. 6
HAM: About INR550 crore of monetisation collections expected in Q3 and Q4
“So INR550 crores of collection is yet to be there, which we are expecting in Quarter 3 and Quarter 4.”
HAM: Karnal Ring Road monetisation not by March; at least 8-10 months away
Harendra Singh · Chairman and Managing Director · p. 13
HAM: Karnal Ring Road monetisation not by March; at least 8-10 months away
“No, it's not likely to be by March because once we receive the PCC, then six months the cooling period, and we'll be applying for this monetization permission from NHAI and bank. It's going to be at least 8-10 months from now.”
One-offs
HAM: Standalone gain from monetisation around INR70 crore, likely in Q3 or Q4
Harendra Singh · Chairman and Managing Director · p. 6
HAM: Standalone gain from monetisation around INR70 crore, likely in Q3 or Q4
“The stand would be around INR70-odd crores, which is likely to be there in Quarter 3 or rather in Quarter 4.”
HAM: Significant loss in net worth incurred in OD-5 and OD-6
Harendra Singh · Chairman and Managing Director · p. 6
HAM: Significant loss in net worth incurred in OD-5 and OD-6
“So at least in OD-5 and OD-6, we have incurred significant loss in that net worth.”
INR18 crore from Maharashtra projects booked as other income
Harendra Singh · Chairman and Managing Director · p. 11
INR18 crore from Maharashtra projects booked as other income
“Interest income is basically there are few projects of Maharashtra where we receive INR18- odd crores, that has been booked into other income.”
Risks
Roads: DLF project only 6% complete due to land constraints
Harendra Singh · Chairman and Managing Director · p. 3
Roads: DLF project only 6% complete due to land constraints
“The DLF project is in an early stage with 6% completion only because the land-related constraints.”
Rail: Kanpur station delayed by lack of blocks; extension approved in principle to Dec 2027
58.85%Harendra Singh · Chairman and Managing Director · p. 4
Rail: Kanpur station delayed by lack of blocks; extension approved in principle to Dec 2027
58.85%“The Kanpur Railway Station project has achieved 58.85% completion, though there has been certain delays because of the blocks not available. The company has applied for extension of time, which has been approved in principle for up to December 2027.”
Rail: Extension sought on Dhule-Nardana as about 11 km land is not available
Harendra Singh · Chairman and Managing Director · p. 4
Rail: Extension sought on Dhule-Nardana as about 11 km land is not available
“the company has applied for the extension of time in this project also, because almost 11 km land is not available as of now.”
Metro: Thane Metro faces land availability and local social issues
Harendra Singh · Chairman and Managing Director · p. 4
Metro: Thane Metro faces land availability and local social issues
“However, this project is facing challenges related to land availability and local social issues also, socioeconomic issues.”
Roads: Five to seven contractors disqualified on UPEIDA Link Expressway for a small technical reason
Harendra Singh · Chairman and Managing Director · p. 14
Roads: Five to seven contractors disqualified on UPEIDA Link Expressway for a small technical reason
“There were almost five to seven odd contractors who were disqualified on the, I think, for a small technical reason, which probably all missed.”
Other
Q2 standalone revenue INR883 crore, EBITDA INR105 crore, margin 11.9%
Harendra Singh · Chairman and Managing Director · p. 5
Q2 standalone revenue INR883 crore, EBITDA INR105 crore, margin 11.9%
“At standalone, revenue has reached INR883 crores with an EBITDA of INR105 crores at an EBITDA margin of 11.9%,”
Q2 standalone PAT INR32 crore (3.6%) vs INR67 crore (5.8%) in Q2 FY26
Harendra Singh · Chairman and Managing Director · p. 5
Q2 standalone PAT INR32 crore (3.6%) vs INR67 crore (5.8%) in Q2 FY26
“with PAT at Quarter 2 at INR32 crores at a margin of 3.6%, compared to INR67 crores at a margin of 5.8% in Quarter 2 FY26.”
H1 standalone revenue INR1,790 crore, EBITDA INR182 crore, margin 10.2%
Harendra Singh · Chairman and Managing Director · p. 5
H1 standalone revenue INR1,790 crore, EBITDA INR182 crore, margin 10.2%
“Revenue for the first half FY27 reached INR1,790 crores with an EBITDA of INR182 crores at a EBITDA margin of 10.2%,”
Q2 consolidated revenue INR974 crore, EBITDA INR250 crore, margin 25.6%
Harendra Singh · Chairman and Managing Director · p. 6
Q2 consolidated revenue INR974 crore, EBITDA INR250 crore, margin 25.6%
“Now regarding the consolidated financial revenue of Quarter 2 FY27, which reached INR974 crores with an EBITDA of INR250 crores and EBITDA margin of 25.6%.”
Q2 consolidated PAT INR80 crore (8.2%) vs INR52 crore (5.7%) in Q2 FY26
Harendra Singh · Chairman and Managing Director · p. 6
Q2 consolidated PAT INR80 crore (8.2%) vs INR52 crore (5.7%) in Q2 FY26
“And PAT for Quarter 2 FY27 stood at INR80 crores with a PAT margin of 8.2%, compared to INR52 crores with a margin of 5.7% in Quarter 2 FY26.”
Sources
- Earnings call transcript, Q2 FY27 Filed 7 Nov 2026 · 15 pages