Capital Goods · NSE: DIACABS
Diamond Power Infrastructure
Q2 FY27 earnings and concall highlights
Q2 FY27 earnings call · Guided by management
Call held 4 Nov 2026 · Read the filing on NSEFiling
- M.Cap
- ₹22,015Cr
- P/E
- 79.6×
- 1Y return
- +144.24%
- From 52W high
- −8.9%
Highlights are read by AI from the company's filing and can contain mistakes. Check the source page linked to each line.
Share price
Results Q2 FY27, as filed · consolidated · ₹ Cr
| Q2 FY27 | Q2 FY26 | YoY | Q1 FY27 | QoQ | |
|---|---|---|---|---|---|
| Revenue | 1,032 | 438 | +135.4% | 690 | +49.6% |
| EBITDA | 115 | 46 | +150.6% | 77 | +49.5% |
| EBITDA margin | 11.2% | 10.5% | +67 bps | 11.2% | -1 bps |
| PBTProfit before tax | 109 | 29 | +277.1% | 59 | +85.1% |
| Net profit | 108 | 28 | +289.0% | 58 | +84.6% |
| EPS (₹) | 1.87 | 0.53 | +252.8% | 1.11 | +68.5% |
From the company's own results filing on NSE. Net profit is the owners' share. Growth and the dotted lines are worked out from the filed figures. In Q2 FY27 the filing tags the owners' profit as ₹0 Cr against its own period profit; the period profit less minority interest is shown.
Guidance
EHV cables: Target: EHV cables to reach double-digit share of top line in Q3 and Q4
Management · Q&A · p. 16
EHV cables: Target: EHV cables to reach double-digit share of top line in Q3 and Q4
“Our assessment is that we want our extra high voltage cable to get into double digit in the quarter three and quarter four of our top line. That is our target.”
More figures from the call
“So EBITDA margins will always remain between 11% to 13%. Once our polymer gets on stream by December 2027, in the next year we will like to give you a band of 14% to 16%.”
“But at Diamond Power, we are very clear, we have a 2-member team to focus on HTLS, but we've also targeted that it will not be more than 5% of our top line at its best.”
“Copper capacity of 1,500 tons a month is live and is being scaled to 2,500.”
“Demand from solar parks is strong enough that we are building a 1,000 kilometre a month single-core 3.3 kV cable plant which will get on stream in the next 18 months.”
“The phase 1, 6 compounding lines which will cost us INR78 crores. Two PVC lines, two silane lines, one master-batch line , and one peroxide-based line with a capacity of 66,500 tons a year.”
In short
- 01FY27 revenue guidance of Rs 4,300 to 4,500 crore kept.
- 02Q2 revenue was Rs 1,032 crore, up 135%; PAT Rs 108 crore.
- 03Net worth turned positive at Rs 764 crore; net cash Rs 572 crore after QIP.
- 04Firm order book Rs 3,735 crore at quoted value, about Rs 4,300 crore at market prices.
- 05EBITDA margin guided at 11% to 13%, then 14% to 16% after the polymer project.
- 06Rs 170 crore polymer complex planned; phase 1 by June-December 2027, phase 2 early 2028.
- 07Data centre cables expected to give Rs 750 crore of revenue this year.
- 08Tax expected to become payable from quarter 1 of 2029.
Capex
Polymer compounds: Polymer project: 30% post-tax IRR; funded by Rs 78 crore QIP and Rs 100 crore accruals
Amit Bhatnagar · Head Corporate Strategy · p. 10
Polymer compounds: Polymer project: 30% post-tax IRR; funded by Rs 78 crore QIP and Rs 100 crore accruals
“The project model shows a 30% post-tax IRR on a consolidated basis. This project is being funded by INR78 crores from the GCP account of the QIP, and INR100 crores from internal accruals, and a small amount of debt if we feel we need to get it.”
Polymer compounds: Polymer capex could give about Rs 800 crore revenue if sold outside
Management · Q&A · p. 19
Polymer compounds: Polymer capex could give about Rs 800 crore revenue if sold outside
“Around INR800 crores.”
Only the Rs 75 crore balancing equipment adds volume; rest of capex does not
Management · Q&A · p. 20
Only the Rs 75 crore balancing equipment adds volume; rest of capex does not
“So if you say plain vanilla to increase the top line, I don't think except the balancing equipment, INR75 crores, rest is not going to add to the volume.”
Polymer compounds: Polymer phase 1 to be commissioned progressively between June and December 2027
Amit Bhatnagar · Head Corporate Strategy · p. 9
Polymer compounds: Polymer phase 1 to be commissioned progressively between June and December 2027
“All of Phase 1 output will be captive. It replaces the compound we buy today. The PVC and catalyst line commissioned first, and the full phase is on stream to be commissioned between June and December 2027 progressively.”
Balancing equipment, copper capacity doubling, 5th and 6th CCV lines under way
Amit Bhatnagar · Head Corporate Strategy · p. 10
Balancing equipment, copper capacity doubling, 5th and 6th CCV lines under way
“The other projects already running are the balancing equipment project, the doubling of the copper cable capacity, the 5th and 6th CCV line which is going to get commissioned.”
Capacity
Polymer compounds: Second polymer phase: 18,000 tons EHV XLPE line, commissioning early 2028
Amit Bhatnagar · Head Corporate Strategy · p. 9
Polymer compounds: Second polymer phase: 18,000 tons EHV XLPE line, commissioning early 2028
“This is going to be 18,000 tons capacity. The line is bought with its know-how package, its formulation, and its cleanliness acceptance. It commissions in early 2028 after the pilot trials on our own raw materials.”
Medium voltage cables: 11 medium voltage cable lines give scale to consume own polymer
Management · Q&A · p. 13
Medium voltage cables: 11 medium voltage cable lines give scale to consume own polymer
“Number two, with 11 medium voltage cable lines, I already have the scale and I already have the capacity to consume the polymer which I am making.”
Polymer compounds: Polymer capacity meant for 100% captive use
Management · Q&A · p. 16
Polymer compounds: Polymer capacity meant for 100% captive use
“So as I mentioned to you that the capacity we are building is meant for 100% captive consumption.”
Capacity utilisation about 45% of level after balancing equipment is operational
Management · Q&A · p. 22
Capacity utilisation about 45% of level after balancing equipment is operational
“So capacity utilization is approximately 45% of what it will be when the entire balancing equipment is operationalized.”
MV and EHV cables: Had 5 CCV lines at the time of the QIP; standard line delivery is about two years
Management · Q&A · p. 12
MV and EHV cables: Had 5 CCV lines at the time of the QIP; standard line delivery is about two years
“So when we did the QIP in August, we had 5 CCV lines, and as you know that the standard delivery period of a line is almost two years.”
Order book
Order book Rs 3,735 crore at quoted value, about Rs 4,300 crore at market prices
Amit Bhatnagar · Head Corporate Strategy · p. 6
Order book Rs 3,735 crore at quoted value, about Rs 4,300 crore at market prices
“Our firm order book at 30th September stands at INR3,735 crores at quoted value and around INR4,300 crores at current market prices under the price variation clause.”
H1 order inflow Rs 2,217 crore against revenue of Rs 1,722 crore
Amit Bhatnagar · Head Corporate Strategy · p. 6
H1 order inflow Rs 2,217 crore against revenue of Rs 1,722 crore
“Order inflow in H1 was INR2,217 crores against a revenue of INR1,722 crores”
Conductors: Order book 46% conductors, incl. Rs 974 crore AL59 order for 800 kV HVDC line
Amit Bhatnagar · Head Corporate Strategy · p. 6
Conductors: Order book 46% conductors, incl. Rs 974 crore AL59 order for 800 kV HVDC line
“The book is 46% conductors including a INR974 crores order of AL59 for 800 kV HVDC line.”
Cables: Key wins incl. Rs 1,370 crore of 11 kV cables for PGVCL, GETCO 66 kV, Adani Electricity
Amit Bhatnagar · Head Corporate Strategy · p. 6
Cables: Key wins incl. Rs 1,370 crore of 11 kV cables for PGVCL, GETCO 66 kV, Adani Electricity
“Key wins in and around the quarter include additional MV and LT cable orders from Adani Electricity Mumbai, our third consecutive year of supplying 66 kV EHV cable for the GETCO project in Jamnagar, INR1,370 crores of 11 kV cables for PGVCL's coastal underground schemes, and AL59 conductors from TBCB Supply.”
Conductors: Pre-bid back-to-back arrangement started with TBCB players
Amit Bhatnagar · Head Corporate Strategy · p. 7
Conductors: Pre-bid back-to-back arrangement started with TBCB players
“we have now started a back-to-back arrangement at pre-bid stage, which assures us that we get orders when the TBCB bid is awarded to a player.”
Segments
Q2 revenue mix: cables 40%, conductors 31%, rest data centre cables
Amit Bhatnagar · Head Corporate Strategy · p. 3
Q2 revenue mix: cables 40%, conductors 31%, rest data centre cables
“Cables were 40% of the revenue, conductors was 31%, and the remaining was data centre cables.”
Data centre cables: Data centre cables gave Rs 242 crore, 23% of Q2 revenue, via EPC contractors
Amit Bhatnagar · Head Corporate Strategy · p. 4
Data centre cables: Data centre cables gave Rs 242 crore, 23% of Q2 revenue, via EPC contractors
“contributed INR242 crores or 23% of the quarter's revenue, supplied through EPC contractors building hyperscale data centres including L&T, AurionPro, Sterling Wilson, and Blue Star.”
Exports: Exports expected to make a large contribution in FY28; distributor set up in UAE
Amit Bhatnagar · Head Corporate Strategy · p. 6
Exports: Exports expected to make a large contribution in FY28; distributor set up in UAE
“I can assure you, in financial year 2027-28, a large contribution shall come from export. We have already put a very large distributor in place in UAE and Middle East.”
Medium voltage cables: 11 and 33 kV cables were 79% of non-data-centre cable revenue
Amit Bhatnagar · Head Corporate Strategy · p. 7
Medium voltage cables: 11 and 33 kV cables were 79% of non-data-centre cable revenue
“11 and 33 kV cables, where 79% of our cable revenue outside data centre, and 33 kV alone was our largest product line.”
Conductors: Over 40,000 km of conductors supplied last year to TBCB developers and Power Grid
Amit Bhatnagar · Head Corporate Strategy · p. 7
Conductors: Over 40,000 km of conductors supplied last year to TBCB developers and Power Grid
“In the last year, we have supplied over 40,000 kilometres of conductors to TBCB developers and to power grid.”
Demand
Medium voltage cables: More than 5,000 km of 33 kV tenders coming up in Bengal
Amit Bhatnagar · Head Corporate Strategy · p. 8
Medium voltage cables: More than 5,000 km of 33 kV tenders coming up in Bengal
“In Bengal, we have seen more than 5,000 kilometres of 33 kV tenders which are now coming up.”
Cable companies typically do 40% of revenue in Q1-Q2 and 60% in Q3-Q4
Amit Bhatnagar · Head Corporate Strategy · p. 10
Cable companies typically do 40% of revenue in Q1-Q2 and 60% in Q3-Q4
“most of the cable companies do 40% revenue in quarter 1 and 2 and 60% come in quarter 3 and 4.”
Data centre cables: More than 230 developers building data centres across 66 cities
Management · Q&A · p. 12
Data centre cables: More than 230 developers building data centres across 66 cities
“So starting from 40 megawatt to gigawatt scale, this thing, the entire market we are scanning is 66 cities. As per the last data available with us, there are more than 230 developers who are developing these data centres.”
EHV cables: EHV utility floated Rs 3,200 crore of tenders this year; Rs 900 crore more closing this month
Management · Q&A · p. 16
EHV cables: EHV utility floated Rs 3,200 crore of tenders this year; Rs 900 crore more closing this month
“months, they have floated tenders of INR3,200 crores, and another INR900 crores will be closed this month, right?”
Medium voltage cables: About 90% of MV orders from five new demand drivers, 10% from traditional industry
Management · Q&A · p. 18
Medium voltage cables: About 90% of MV orders from five new demand drivers, 10% from traditional industry
“you will see that almost 90% orders are coming from these segments and just 10% orders are coming from the traditional industry segment.”
Margins and costs
Employee and other expenses fell to 5.7% of revenue from 8.2% a year ago
Amit Bhatnagar · Head Corporate Strategy · p. 4
Employee and other expenses fell to 5.7% of revenue from 8.2% a year ago
“Employee and other expenses came down to 5.7% of revenue from 8.2% a year ago.”
EBITDA margin up 240 bps while contribution margin moved from 18.7% to 16.9%
Amit Bhatnagar · Head Corporate Strategy · p. 4
EBITDA margin up 240 bps while contribution margin moved from 18.7% to 16.9%
“That is why EBITDA margin expanded on 240 basis points, even though the contribution margin as a percentage moved from 18.7% to 16.9%.”
Price variation clauses protect absolute contribution per ton against metal prices
Amit Bhatnagar · Head Corporate Strategy · p. 4
Price variation clauses protect absolute contribution per ton against metal prices
“Higher LME aluminium prices inflate the revenue base. Our contracts carry price variation clauses, so the absolute contribution per ton is protected.”
Data centre cables: Data centre cable entry barrier leaves at least 2% extra margin
Management · Q&A · p. 14
Data centre cables: Data centre cable entry barrier leaves at least 2% extra margin
“So obviously there is a entry barrier there. So this entry barrier leaves at least 2% extra margin for you.”
MV and EHV cables: In MV and EHV cables, metal is 35-40% and polymer 35% of raw material
Management · Q&A · p. 15
MV and EHV cables: In MV and EHV cables, metal is 35-40% and polymer 35% of raw material
“If it is a medium voltage and extra high voltage cable, the metal is 40%, or in some cases even 35%, and the polymer is 35%.”
Debt and working capital
Net worth moved from minus Rs 604 crore to plus Rs 764 crore; net cash Rs 572 crore
Amit Bhatnagar · Head Corporate Strategy · p. 5
Net worth moved from minus Rs 604 crore to plus Rs 764 crore; net cash Rs 572 crore
“At 31st March this year, our net worth was negative by INR604 crores. At 30th September, it is positive by INR764 crores. Net debt of INR527 crores has become net cash of INR572 crores.”
Promoter loans fully repaid
Amit Bhatnagar · Head Corporate Strategy · p. 5
Promoter loans fully repaid
“The promoter loans, as we mentioned in the last call, have been completely repaid.”
Q2 finance cost Rs 12 crore is mostly LC discounting and bank charges, not debt
Amit Bhatnagar · Head Corporate Strategy · p. 5
Q2 finance cost Rs 12 crore is mostly LC discounting and bank charges, not debt
“The INR12 crores of finance cost you see in this quarter is almost entirely LC discounting and bank charges on a much larger volume of business, a cost of trade, not, not an actual debt.”
Exited NCLT process; now eligible for credit rating, fresh bank lines being tied up
Amit Bhatnagar · Head Corporate Strategy · p. 5
Exited NCLT process; now eligible for credit rating, fresh bank lines being tied up
“The Company has successfully exited the NCLT process in its entirety, with all planned payments completed. Lender NOC release of charges are in process, and we are now eligible for a credit rating for fresh bank lines which are being tied up.”
Legacy receivables Rs 957 crore; Rs 300 crore expected, Rs 116 crore confirmed
Management · Q&A · p. 23
Legacy receivables Rs 957 crore; Rs 300 crore expected, Rs 116 crore confirmed
“We, we said that INR957 crores is the legacy receivable. We are positive on recovering INR300 crores, out of which around INR116 crores is now quantified”
Fund raising
QIP in July raised Rs 1,614 crore to meet minimum public shareholding
Amit Bhatnagar · Head Corporate Strategy · p. 5
QIP in July raised Rs 1,614 crore to meet minimum public shareholding
“The QIP in July, we completed and raised INR1,614 crores entirely due to the fact that we have to bring down our minimum shareholding.”
Acquisitions and new business
Green hydrogen and offshore cables: Focusing on green hydrogen and offshore cables; news expected shortly
Amit Bhatnagar · Head Corporate Strategy · p. 8
Green hydrogen and offshore cables: Focusing on green hydrogen and offshore cables; news expected shortly
“Green hydrogen and offshore cables is something which we are now focusing upon, and I can assure you that we will be able to share with you some good news on these markets very shortly.”
Polymer compounds: No Indian cable maker today makes XLPE polymer for cables above 66 kV
Amit Bhatnagar · Head Corporate Strategy · p. 9
Polymer compounds: No Indian cable maker today makes XLPE polymer for cables above 66 kV
“What we have never made and what no Indian cable manufacturer makes today is the cross-linked polyethylene polymer for cables above 66 kV.”
Management
New Chief Operating Officer and new CFO appointed
Amit Bhatnagar · Head Corporate Strategy · p. 10
New Chief Operating Officer and new CFO appointed
“We have a new Chief Operating Officer and a new CFO, both of whom have a fantastic industry experience.”
Succession planning started; next generation to join decisions in 5 to 7 years
Amit Bhatnagar · Head Corporate Strategy · p. 11
Succession planning started; next generation to join decisions in 5 to 7 years
“We have now started working on succession planning and a director's office has been made so that in the next five to seven years, we get our Gen Next to come on board and start being part of the decision-making process in the company.”
One-offs
Resolution plan prepaid at Rs 501 crore a year early, with about Rs 9.5 crore discount
Amit Bhatnagar · Head Corporate Strategy · p. 5
Resolution plan prepaid at Rs 501 crore a year early, with about Rs 9.5 crore discount
“The resolution plan in September was prepaid for full INR501 crores cash consideration a year ahead of September 2027 deadline, availing a prepayment discount of almost INR9.5 crores.”
Risks
Adani Group is 43% of order book; aim to cap Adani's top-line share at 20% over time
Amit Bhatnagar · Head Corporate Strategy · p. 6
Adani Group is 43% of order book; aim to cap Adani's top-line share at 20% over time
“Adani Group entities are 43% of the order book, and we aim Adani's share of top line to a stated cap of 20% to 20% over time, with every Adani order placed at market price on a reverse auction basis.”
Geopolitical risk named for government-dominated infrastructure business
Management · Q&A · p. 20
Geopolitical risk named for government-dominated infrastructure business
“infrastructure business, which is the power, road, or businesses which at the end of the day are 60%, 70% dominated by government or controlled by government, there is always a geopolitical risk which is associated.”
Management sees no major risk that could upset the business overnight
Management · Q&A · p. 21
Management sees no major risk that could upset the business overnight
“So we are not seeing any major risk which can turn the apple cart overnight.”
MV and EHV cables: Competitors adding lines expected to take 2-3 years to match current line count
Management · Q&A · p. 13
MV and EHV cables: Competitors adding lines expected to take 2-3 years to match current line count
“I'm sure there are competitors who are going to add the line. They will take two, three years to reach the number I already have. And by that time, I would have doubled my numbers.”
Other
Q2 revenue Rs 1,032 crore, up 135% year on year and 50% on quarter
Amit Bhatnagar · Head Corporate Strategy · p. 3
Q2 revenue Rs 1,032 crore, up 135% year on year and 50% on quarter
“Revenue from operations for Q2 was INR1,032 crores, up 135% over the same quarter last year and up 50% sequentially.”
Q2 EBITDA incl. other income Rs 133 crore, up 189%, margin 12.9%
Amit Bhatnagar · Head Corporate Strategy · p. 3
Q2 EBITDA incl. other income Rs 133 crore, up 189%, margin 12.9%
“EBITDA including other income was INR133 crores, up 189%, at a margin of 12.9%.”
Q2 PAT Rs 108 crore against Rs 28 crore a year ago, 3.9x
Amit Bhatnagar · Head Corporate Strategy · p. 3
Q2 PAT Rs 108 crore against Rs 28 crore a year ago, 3.9x
“Profit after tax was INR108 crores against INR28 crores a year ago. That is 3.9x.”
H1 revenue Rs 1,722 crore, EBITDA Rs 218 crore, PAT Rs 166 crore
Amit Bhatnagar · Head Corporate Strategy · p. 3
H1 revenue Rs 1,722 crore, EBITDA Rs 218 crore, PAT Rs 166 crore
“For the half-year, revenue was INR1,722 crores, EBITDA at INR218 crores, and PAT at INR166 crores.”
H1 profit of Rs 166 crore is above the Rs 158 crore earned in all of FY26
Amit Bhatnagar · Head Corporate Strategy · p. 3
H1 profit of Rs 166 crore is above the Rs 158 crore earned in all of FY26
“Second, our H1 profit of INR166 crores is already higher than the INR158 crores we earned in the whole year, in the financial year '26.”
Sources
- Earnings call transcript, Q2 FY27 Filed 7 Nov 2026 · 24 pages
Management's own statements, quoted from its NSE filings. This page was read by AI and can contain mistakes: check the source pages before relying on any figure. No forecast or opinion of ours. Not investment advice.